Exide S47-0079 manual Power Transformer Setting

Page 5

NOTE: When a 120/208/240 AC input unit is set for 120VAC a fuse neutral (brass tube) is required in the Line 2 (neutral) fuse position.

Fig. 1.3.1.

A.C. Voltage Adjustments

1 Ø 60Hz. (120/208/240)

“A” Voltage Code

Fig. 1.3.2.

A.C. Voltage Adjustments

1Ø & 3Ø 60Hz. (208/240/480)

“B” Voltage Code

Fig.1.3.3.

A.C. Voltage Adjustments

3 Ø 60Hz. (480/575)

“K” Voltage Code

POWER TRANSFORMER SETTING

L1 L2

123 456

480

1 2 3 4

CONTROL

TRANSFORMER

L1 L2

123 456

575

1 2 3 4

CONTROL

TRANSFORMER

5

Image 5
Contents GNB Section Description IndexImportant Save These Instructions Line Voltage Adjustments InstallationReceiving LocationPower Transformer Setting Connecting AC Service to the Charger AC Service RequirementsGrounding the Charger Battery Connector and Charging CableCharging Rate Adjustment Operation 1 046-0371 Control Feature SummaryNormal Daily Charge OperationAuto- Refresh Charge Delayed StartEqualize Charge Charge Time Viewing Charge InformationDisplay Description Charge IndicationsJumper Settings 10 F3 Low Battery OverrideParameter Message Range ProgrammingPossible Cause Optional FeaturesGeneral Maintenance Excessive water loss in batteryAC fuse blows DC fuse blowsRecommended Spares Replaceable PartsOrdering Information Part Number Description Condensers Spare Parts ListThree Phase Charger Schematic # Single Phase Charger Schematic # 02-490