START-UP CHECKLIST

I. PRELIMINARY INFORMATION

OUTDOOR: MODEL NO. __________________________________

SERIAL NO.____________________________________

INDOOR: AIR HANDLER MANUFACTURER _____________________________________________________________

MODEL NO. ___________________________________

SERIAL NO.____________________________________

ADDITIONAL ACCESSORIES ______________________________________________________________________________

II. PRE-START-UP

OUTDOOR UNIT

 

IS THERE ANY SHIPPING DAMAGE? _______

(Y/N) _______

IF SO, WHERE: _________________________________________________________________________________________

______________________________________________________________________________________________________

WILL THIS DAMAGE PREVENT UNIT START-UP? (Y/N) _______

CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT? (Y/N) _______

HAS THE GROUND WIRE BEEN CONNECTED? (Y/N) _______

HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY? (Y/N) _______

ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY? (Y/N) _______

HAVE COMPRESSOR HOLDDOWN BOLTS BEEN LOOSENED, WHERE APPLICABLE (Snubber washers are snug, but not tight)?

(Y/N) _______

 

 

 

CONTROLS

 

 

 

ARE THERMOSTAT AND INDOOR-FAN CONTROL WIRING

 

 

CONNECTIONS MADE AND CHECKED?

(Y/N) _______

 

 

ARE ALL WIRING TERMINALS (including main power supply) TIGHT?

(Y/N) _______

HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS?

(Y/N) _______

 

INDOOR UNIT

 

 

 

HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?

(Y/N) _______

ARE PROPER AIR FILTERS IN PLACE?

(Y/N) _______

 

 

HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?

(Y/N) _______

DO THE FAN BELTS HAVE PROPER TENSION? (Y/N) _______

 

 

HAS CORRECT FAN ROTATION BEEN CONFIRMED? (Y/N) _______

 

PIPING

IS LIQUID LINE SOLENOID VALVE LOCATED AT THE EVAPORATOR COIL AS REQUIRED? (Y/N) _______

HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, CONDENSER, EVAPORATOR,

TXVs (Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS WITH A LEAK DETECTOR? (Y/N) _______

LOCATE, REPAIR, AND REPORT ANY LEAKS. ________________________________________________________________

ARE ALL 576B COMPRESSOR SERVICE VALVES FULLY OPENED (BACKSEATED)? (Y/N) _______

HAVE LIQUID LINE SERVICE VALVE AND SUCTION LINE SERVICE VALVE BEEN OPENED? (Y/N) _______

IS THE OIL LEVEL IN COMPRESSOR CRANKCASE ON 576B UNIT IN VIEW IN THE COMPRESSOR SIGHT GLASS? (Y/N) _______

CHECK VOLTAGE IMBALANCE

LINE-TO-LINE VOLTS: AB _______ V AC _______ V BC _______ V

(AB + AC + BC)/3 = AVERAGE VOLTAGE =V

MAXIMUM DEVIATION FROM AVERAGE VOLTAGE = __________ V

VOLTAGE IMBALANCE = 100 X (MAX DEVIATION)/(AVERAGE VOLTAGE) = __________ %

IF OVER 2% VOLTAGE IMBALANCE, DO NOT ATTEMPT TO START SYSTEM!

CALL LOCAL POWER COMPANY FOR ASSISTANCE.

CL-1

Image 15
Contents Important Read Before Installing ContentsSafety Considerations III. Compressor Mounting InstallationLocate the Unit II. RIG and Place UnitPhysical Data Electrical Connections Dimensions ft-inService Valve Connections Weight Chart lbField Power Supply Fig Refrigerant Piping SizesLiquid Line Data Control Voltage Connections Power Wiring ConnectionsElectrical Data PRE-START-UP VI. Accessory InstallationAccessory List AccessoryCare and Maintenance START-UP START-UP and AdjustmentsCompressors Service CleaningCondenser Coil II. LubricationCompressor Removal VI. Crankcase HeaterVII. Refrigerant Charge IX. High Flow Valves VIII. Refrigerant Service PortsSymptom Cause Remedy Troubleshooting GuideCLO LPSCAP OFCIndoor Unit START-UP ChecklistOutdoor Unit ControlsIII. START-UP