Bryant 576b installation instructions Iii. Start-Up

Page 16

III. START-UP

CHECK EVAPORATOR-FAN SPEED AND RECORD. _______

CHECK CONDENSER-FAN SPEED AND RECORD. _______

AFTER AT LEAST 15 MINUTES RUNNING TIME, RECORD THE FOLLOWING MEASUREMENTS:

OIL PRESSURE (576B only)

SUCTION PRESSURE

SUCTION LINE TEMP

DISCHARGE PRESSURE

DISCHARGE LINE TEMP

ENTERING CONDENSER-AIR TEMP

LEAVING CONDENSER-AIR TEMP

EVAP ENTERING-AIR DB (dry bulb) TEMP

EVAP ENTERING-AIR WB (wet bulb) TEMP

EVAP LEAVING-AIR DB TEMP

EVAP LEAVING-AIR WB TEMP

COMPRESSOR AMPS (L1/L2/L3)_____ / _____ / _____

HAS REFRIGERANT CHARGE BEEN ADJUSTED PER UNIT CHARGING CHART? _______________

NOTES:

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

______________________________________________________________________________________________________

CUT ALONG DOTTED LINE

CUT ALONG DOTTED LINE

Copyright 2000 Bryant Heating & Cooling Systems

801

CL-2

CATALOG NO. 5356-903

Image 16
Contents Contents Important Read Before InstallingSafety Considerations Installation Locate the UnitII. RIG and Place Unit III. Compressor MountingPhysical Data Dimensions ft-in Service Valve ConnectionsWeight Chart lb Electrical ConnectionsRefrigerant Piping Sizes Field Power Supply FigLiquid Line Data Power Wiring Connections Control Voltage ConnectionsElectrical Data VI. Accessory Installation Accessory ListAccessory PRE-START-UPSTART-UP START-UP and Adjustments Care and MaintenanceService Cleaning Condenser CoilII. Lubrication CompressorsVI. Crankcase Heater Compressor RemovalVII. Refrigerant Charge VIII. Refrigerant Service Ports IX. High Flow ValvesTroubleshooting Guide Symptom Cause RemedyLPS CAPOFC CLOSTART-UP Checklist Outdoor UnitControls Indoor UnitIII. START-UP