Powermatic M-1791257 operating instructions Table of Contents

Page 3

Table of Contents

 

Warranty and Service

2

Table of Contents

3

Warning

5

Introduction

7

Specifications

7

Features and Terminology

8

Floor Diagrams

8

Unpacking

9

Contents of the Shipping Container

9

Assembly

10

Installing Fence and Rails

10

Dust Collection

12

Grounding Instructions

12

Extension cords

13

230 Volt, Single Phase Operation

13

230 Volt, Three Phase Operation

13

Converting from 230 Volt to 460 Volt (Three Phase Only)

14

Three-Phase Test Run

14

Adjustments

15

Table Tilt

15

90° Table Stop

15

Installing/Changing Blades

16

Blade Tension

16

Blade Tracking

17

Upper Blade Guide Assembly

18

Upper Blade Guides and Upper Support Bearing

18

Lower Blade Guides and Lower Support Bearing

19

Miter Gauge

20

Belt Tension

20

Belt Alignment

21

Blade Speed Adjustment

21

Operating Controls

21

Brake Pedal

22

Operation

22

General Procedure

22

Ripping

23

Crosscutting

23

Resawing

23

Blade Lead

23

Blade Selection

24

Width

25

Pitch

25

Shape

25

Set

26

Material

26

Blade Breakage

26

Maintenance

27

Tire Replacement

27

Band Wheel Replacement

27

Blade Selection Guide

28

For Radius Cutting

28

Troubleshooting – Operational Problems

29

Troubleshooting – Mechanical and Electrical Problems

31

Replacement Parts

32

Parts List: Saw Body Assembly (2013 Band Saw)

33

Parts List: Saw Body Assembly (2415 Band Saw)

34

Saw Body Assembly (2013 and 2415)

35

Parts List: Table Assembly (2013 Band Saw)

36

Parts List: Table Assembly (2415 Band Saw)

38

Table Assembly (2013 and 2415)

40

Parts List: Upper Wheel Base Assembly (2013 Band Saw)

41

Parts List: Upper Wheel Base Assembly (2415 Band Saw)

42

3

Image 3
Contents 20and 24 Band Saws Warranty Period Warranty and ServiceTable of Contents Page Page Page 2013 Introduction SpecificationsFloor Diagrams Features and TerminologyUnpacking Contents of the Shipping ContainerInstalling Fence and Rails AssemblyPage Dust Collection Grounding InstructionsVolt, Single Phase Operation Volt, Three Phase OperationExtension cords Three-Phase Test Run Converting from 230 Volt to 460 Volt Three Phase OnlyAdjustments Table TiltTable Stop Blade Tension Installing/Changing BladesBlade Tracking Upper Blade Guides and Upper Support Bearing Upper Blade Guide AssemblyLower Blade Guides and Lower Support Bearing Belt Tension Miter GaugeBlade Speed Adjustment Operating ControlsBelt Alignment General Procedure OperationBrake Pedal Blade Lead RippingCrosscutting ResawingBlade Selection Width PitchShape Material SetMaintenance Tire ReplacementBand Wheel Replacement For Radius Cutting Blade Selection GuideTroubleshooting Operational Problems Trouble Troubleshooting Mechanical and Electrical Problems Trouble Probable Cause Remedy Replacement PartsIndex No. Part No Description Size Qty Parts List Saw Body Assembly 2013 Band Saw2415-102ORN Parts List Saw Body Assembly 2415 Band SawSaw Body Assembly 2013 Parts List Table Assembly 2013 Band Saw Index No. Part No Description Size Qty Parts List Table Assembly 2415 Band Saw Index No. Part No Description Size Qty Table Assembly 2013 For 2013-3, serial #01062013090 to Parts List Upper Wheel Base Assembly 2013 Band SawFor 2415-3, serial #01062415011 to Parts List Upper Wheel Base Assembly 2415 Band SawUpper Wheel Base Assembly 2013 Parts List Lower Wheel Base Assembly 2013 Band Saw ST 18AWG Parts List Lower Wheel Base Assembly 2415 Band Saw 2013-459 Limit Switch Cord not shown Lower Wheel Base Assembly 2013 Parts List Guide Bracket Assembly 2013 Band Saw Index No. Part No Description Size Qty Parts List Guide Bracket Assembly 2415 Band Saw Index No. Part No Description Size Qty Guide Bracket Assembly 2013 Band Saw only MotorMagnetic Switch Electrical Connections 230 Volt, 3 Phase Models 2013 Electrical Connections 460 Volt, 3 Phase Models 2013 This page intentionally left blank This page intentionally left blank