Place carriage bolt M10x30 from underneath through carrier and slot of fence segment. Install washer Ø 10.5 and ratched lever M10 female.
Install 0° (90°) setting screw into mitre fence carrier.
Hardware:
1 set screw M8x20
2 hex. thin nut M8
7.1 Mitre Fence Setting
A
To set mitre fence square with the blade turn setting screw in or out, as required.
B
Make trial cut to verify setting.
C
Loosen mitre scale and adjust so that zero mark corresponds with mark on vernier scale, then retighten.
8.0Installation
8.1Setup
This saw must be placed on a firm and level ground. The work area must be kept clear of all waste to provide firm footing for the operator.
8.2 Connection to Power Mains
-Check if voltage of power mains matches with voltage stated on machine’s name plate. This machine must be earthed while in use to protect the operator from electric shock.
-Models BKS400/3.1 kW must be connected to an earthed outlet with a
-Models BKS 450/4.2 kW and 4.75 kW have to be connected to an earthed outlet with a
-A minimum conductor cross section of 1.5mm /16 AWG is required. For the 3.1kW
-Use of an extension cord with too small a conductor cross section causes voltage drop and consequently starting problems and excessive heat
8.3 Saw Blade Direction of Rotation
-On
-For
incorrect interchange two phases by rotating two pins in the switch by 180°. Remove plug, use screwdriver with 6mm/1/4" blade to push lock down and turn pins.
-To prevent unauthorized use the switch can be blok- ked with a padlock.