Windsor QQS34SP, QQS28 Service Schedule, Before Starting Work Period End of Work Storing

Page 14

SERVICE SCHEDULE

Before

Starting

the Work

Period

End of Work

Period

Before

Storing

Maintenance Item

Check Battery water level

Check Vac Hose Connections

Clean the Squeegee Blades

Inspect Brushes or Pads for debris ie: wire, string, wear Inspect Vac fan shut off float screen

Drain & Rinse Tanks

Raise Squeegee Assembly

Raise Scrub Deck Assembly

Charge the Batteries

Remove the Pad Drivers/Brushes

Check the Brushes/Padsfor Damage and or wear Clean Squeegee blades

Clean recovery tank vac shutoff & screen

Check Battery Cells w/Hydrometer

Check Solution Strainer

Check Pivot Points, Caster, and Squeegee for proper lubrication Inspect tank and hoses

Clean tops of Batteries and Tray

Check Battery Cable Clamps

Use a Vacuum to remove lint from the motor windings Grease Squeegee pivot and Casters

Inspect all Motors for Carbon Motor Brush Wear.

Daily

*

*

*

*

*

*

*

*

*

*

*

*

*

Weekly Monthly Annually

*

*

*

*

*

*

*

*

*

14

SABER/STRIDE II 28/34 98570 5/1/98

Image 14
Contents Saber StrideYour Dealer Using this ManualMachine Data LOG OverviewTable of Contents Safety Hazard Intensity LevelTechnical Specifications MODELSABER/STRIDE II 28/34Operation Controls Machine Operation Emptying and Cleaning Tanks Double ScrubUncoated Floors MaintenanceScrub Brushes Finished FloorsCorrect Not Enough Scrub Deck Skirt and SqueegeeSqueegee Blades TOO MuchTo Adjust Amount of Rear Squeegee Deflection Adjusting SqueegeeTo Adjust Squeegee Pitch Tires and WheelsBatteries Battery MaintenanceChecking Battery Specific Gravity Checking GravityTo Charge the Batteries Changing BatteriesService Schedule Before Starting Work Period End of Work StoringSqueegee BLADE/BRUSH Head Options Squeegee Blade Options Brush Head OptionsService Location Details ALL ModelsService Location Parts List