Installation

Frame pre-hooking support

 

 

 

Safety belt

 

 

 

Frame fixing screw

 

 

 

 

 

A. Gasket

"A"

 

 

B. Gasket

"B"

 

A

B

 

 

 

Air discharge

Installation of grille/frame assembly

Ensure that the frame is not distorted by excessive tightening,

 

that it is aligned with the false ceiling and above all that there is

 

a seal between the air inlet and outlet.

 

Carefully unpack the assembly and check for damage sustained in

In the drawing gasket "A" prevents return air from mixing with

the supply air and gasket "B" prevents the supply air from

transit. Attach the assembly to the unit by using the two hooks.

leaking into the ceiling void.

 

Use the screws supplied to fix the frame in position.

On completion, the gap between the unit frame and the false

ceiling must not be more than 5 mm.

 

Water connections

Water connections are fixed to the unit body to avoid damage when pipes are connected; it is advisable to tighten the connection with a spanner.

The upper coil connection is supplied with an air purge valve, the lower connection with a water purge valve, suitable for a 10 mm wrench or screw-driver.

(The coil is only partially drainable; it it is advisable to blow air into the coil for complete drainage).

Models

Connections

 

Models

Connections

 

dimension (Ø)

 

 

dimension (Ø)

 

004

3/4"

012

1"

 

008

3/4"

016

1"

 

010

3/4"

020

1"

 

004*

1/2"

 

020*

3/4"

 

010 *

1/2"

 

* Hot water circuits, four-pipe version

 

 

It is necessary, when the installation is made, to insulate the valve and the connection pipes with anti-condensate material of polyethylene type or expanded neoprene.

Checking

Before unit operation pour a quantity of water into the external auxiliary drain pan. Verify that the water flows into the internal condensate drain pan and that the pump regularly drains the liquid.

Otherwise check the pipe slope and look for possible obstructions. Water connections are fixed to the unit body to avoid damage when pipes are connected; it is advisable to tighten the connection with a spanner.

Water inlet Water outlet Air purge valve Water purge valve

GB - 8

Image 9
Contents 42GW 42 GW Hydronic Global Cassette Fan Coil Units Contents42GW Dimensions and weights004 008 42GW 012 016Technical data Choosing the installation site Unit installationGeneral Information Positions to avoidAvoid Prior to installation InstallationInstallation Only restrict the air outlets as indicated in the drawingCondensate drain pipe Installation of grille/frame assembly Water connectionsUse the screws supplied to fix the frame in position Mod GW Motorized valve and controlOperation of the thermo-electric valve Electrical wiringWater connection ON-OFF valvesStandard version unit Control panel Electrical connectionsConnections Wiring diagram legendImportant for units with electric heaters Cables colourElectric heater Wiring diagram, standard version unitSupply Valves connection49 105 Air intake grilleAir distribution to adjacent room Fresh air intakeWinter operation diagram with fresh air intake Fresh air renewalConditioned air supply to an adjacent room Guide for the owner Maintenance and owners guideVia R. Sanzio, 9 20058 Villasanta MI Italy Tel /3636.1 L010122H22