Black Box QuietCab, 12U Preparing the Cabinet for Installation, Handling, Tools You Will Need

Page 16

Chapter 3: Preparing the Cabinet for Installation

3. Preparing the Cabinet for Installation

Follow these simple recommendations for best performance from your new enclosure.

3.1 Handling

NOTE: For palletized cabinets, see the unpacking instruction sheet before attempting to remove the cabinet from the pallet.

To achieve the level of acoustic performance and industrial needs of a high-quality 19” enclosure, the composition of cabinet parts means that the QuietCab cabinets are very heavy. When moving the cabinet, we recommend that a minimum of two people carry out this task.

3.2 Tools You Will Need

10-mm ratchet and socket

Phillips screwdriver

Utility knife

Level

Cage nut tool

3.3 Adjusting the Doors

The QuietCab cabinet’s doors are aligned before they leave the factory. But in case they need adjustment, follow these instructions.

Side-to-side adjustment

Turning the front screw on the hinge counterclockwise will move the door closer to the corresponding side panel. Turning the screw clockwise will move the door toward the opposite side panel.

Front-to-back adjustment

Loosening the back screw will allow the hinge to be adjusted frontward or backward. Tighten the screw after adjustment.

Page 16

724-746-5500 blackbox.com

Image 16
Contents Customer Support Information Blackbox.com Trademarks Used in this ManualTrademarks Used in this Manual Normas Oficiales Mexicanas NOM Electrical Safety Statement FCC and IC RFI Statements and NOM StatementNOM Statement NOM Statement Table of Contents Specifications SpecificationsU QuietCab 29.5in 750mm 48.7in 1238 mm 44.6in 1132mm 29.5in 750mm Features OverviewOverview Introduction What’s IncludedOverview Accessories Hardware Description Shows the QuietCab components. -2 describes these componentsU, 24U, and 42U QuietCabs’ components Preparing the Cabinet for Installation Preparing the Cabinet for InstallationAdjusting the Doors HandlingCable Management Cable ManagementTop Panel Cable Entry Bottom Cable Entry Installing Equipment in the Cabinet Leveling the Cabinet Installing Equipment in the CabinetAdjusting the Vertical Mounting Rails Bolt Additional Accessories Additional AccessoriesVertical and Horizontal Cable Managers Additional Accessories Filter Package Side filter Front filter Cover Thumbscrews Blackbox.com Blackbox.com Black Box Tech Support FREE! Live /7