Chapter 5: Installing Equipment in the Cabinet
5. Installing Equipment in the Cabinet
5.1 Leveling the Cabinet
Level the enclosure before installing equipment. The leveling feet at the corners provide a stable base if the floor is uneven, but they cannot compensate for a badly sloped surface.
1.Move the enclosure to a level location.
2.For each leveling foot, turn the leveling foot clockwise until it makes firm contact with the floor.
5.2 Adjusting the Vertical Mounting Rails
Vertical mounting rails are factory installed on the enclosure (see Figure
Adjustable front | Fixed rear | |
vertical rails | ||
vertical rails | ||
|
Figure 5-1. Vertical mounting rails installed in the cabinet.