Grizzly G0562Z owner manual Assembly, To assemble your dust collector

Page 16

Assembly

To assemble your dust collector:

1.Place the base upside down on a clean, flat surface (to avoid scratching the paint).

2.Attach the casters to the base with (16) 516"- 18 x 12" flange bolts, as shown in Figure 9.

x 16

Figure 9. Caster installed onto the base.

3.Turn the base over, align the motor and impeller assembly with the mounting holes, then secure the assembly with (4) 516"-18 x 12" flange bolts, as shown in Figure 10.

BdidgVcY>beZaaZg6hhZbWan

x 4

7VhZEaViZ

Figure 10. Motor and impeller assembly installed

onto the base.

4.Place a rubber gasket around the impeller outlet rim, as shown in Figure 11.

Gasket

Figure 11. Positioning impeller outlet gasket.

5.Secure the metal "Y" outlet to the impeller outlet with (8) 516"-18 x 12" flange bolts, as shown in Figure 12.

x 8

"Y" Outlet

Figure 12. Outlet connector installed.

-14-

Model G0562Z/ZP, G1030Z2/Z2P (Mfg. 11/11+)

Image 16
Contents Dust Collector G0562Z G1030Z2Ss ,EAD from Leadbased PAINTS Table of Contents Introduction Manual AccuracyContact Info Machine DescriptionIdentification Paddle SwitchFilter Bag Motor Dust Collectors Impeller Information Safety Safety Instructions for MachineryChildren & BYSTANDERS. @ZZe XaYgZc ZghWZXdbZVYhigVXidc#Additional Safety for Dust Collectors Power Supply AvailabilityFull-Load Current Rating Circuit InformationGrounding Requirements Extension CordsMinimum Gauge Size 14 AWG 50 ft Setup Needed for Setup Unpacking Description QtyInventory Inventory Item QtySite Considerations Assembly To assemble your dust collectorOutlet Canister Support Installing wide foam strip 13. G0562Z/G0562ZP onlyInstalled inlet Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ G1030Z2/G1030Z2P onlyConnecting Power Power ConnectionDisconnecting Power Test Run To test run the machineGeneral Duct Material Designing SystemMetal Duct Flexible Duct Plastic DuctSystem Design Decide Who Will DesignSketch Your Shop Layout Sketch a Basic Duct LayoutMachine Approximate Determine Required CFM of Each MachineMachine Determining Main Line Duct Size Determining Branch Line Duct SizeTotal CFM Branch Line Size 400 500 600 700 800 900 1000Calculating Duct Resistance Duct Approximate DiaLoss Per Foot Fitting 90˚ 45˚ Dia Elbow WyeYSystem Grounding Plastic Blast Gate General OperationsMachine Storage Accessories Dust collection accessoriesMetal Duct Starter Kit Reducers & Adapters Metal BranchesMetal Elbows Maintenance Bag CleaningSchedule LubricationBags Emptying/ReplacingTo replace the collection bag Service TroubleshootingSymptom Possible Cause Possible Solution Motor & ElectricalDust Collector Operation Wiring Wiring Safety InstructionsShock HAZARD. Ldg`c\dclgc\iVihXdc XdbedcZcih#E699AHLI8= Wiring DiagramStart capacitor Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ G0562Z/G1030Z2 Main Breakdown PartsSee H5783 Parts Breakdown G0562Z/G1030Z2 Main Parts List DescriptionG0562ZP/G1030Z2P Main Breakdown G0562ZP/G1030Z2P Main Parts List Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ 10. 8dbbZcih EaVXZ HiVbe =ZgZ 99.$5342!, .# 0//88 %,,.!- 7! Warranty and Returns Order Hours a DAY
Related manuals
Manual 48 pages 47.83 Kb