Determining Main Line Duct Size

The general rule of thumb for a main line duct is that the velocity of the airflow must not fall below 3500 FPM.

For small/medium sized shops, using the inlet size of the dust collector as the main line duct size will usually keep the air velocity above 3500 FPM and, depending on your system, will allow you to keep multiple branches open at one time.

Mark your drawing as in Figure 38, but using the inlet size for your dust collector as the main line.

)

)

)

 

 

 

*

+

)

 

 

 

 

)

Figure 38. Main line size labeled on sketch.

Determining Branch Line Duct Size

The general rule of thumb for a branch line duct is that the velocity of the airflow must not fall below 4000 FPM.

For small/medium sized shops, using the dust port size from the machine as the branch line duct size will achieve the correct velocity in most appli- cations. However, if the dust port on the machine is smaller than 4", make the branch line 4" and neck the line down right before the dust port.

Note: Systems with powerful dust collectors work better if multiple blast gates are left open. This also allows you to run two machines at once. Experiment with different combinations of blast gates open/closed to find the best results for your system.

Write your determined branch line sizes on your drawing, as shown in Figure 39.

-24-

 

)

4''

*

 

 

 

4''

 

5''

6''

 

 

 

4''

 

 

 

 

4''

4''

 

 

 

Figure 39. Branch line sizes labeled on sketch.

Here are some frequently asked questions when determining branch line sizes:

How do I figure which size of branch line to use if the machine has two dust ports?

Simply add the total CFM given for each size from Figure 35 and refer that CFM number to Figure 40. Then, split the branch line just before the dust ports with matching duct sizes.

What if two machines share the same branch line? You have two options:

1.If both machines will be running at the same time, add the total CFM given for each size from Figure 35 and match the branch line given in

Figure 40.

2.If both the machines will never be run at the same time, reference the machine with biggest dust port to Figure 40 and add blast gates after the Y-branch to open/close the line to each machine.

Total CFM

Branch Line Size

400

4"

500

4"

600

5"

700

5"

800

6"

900

6"

1000

6"

Figure 40. Branch line sizing chart by total CFM (for use when multiple machines share line).

Model G0562Z/ZP, G1030Z2/Z2P (Mfg. 11/11+)

Image 26
Contents Dust Collector G0562Z G1030Z2Ss ,EAD from Leadbased PAINTS Table of Contents Contact Info IntroductionManual Accuracy Machine DescriptionFilter Bag Motor Paddle SwitchIdentification Dust Collectors Impeller Information Safety Safety Instructions for MachineryChildren & BYSTANDERS. @ZZe XaYgZc ZghWZXdbZVYhigVXidc#Additional Safety for Dust Collectors Full-Load Current Rating Power SupplyAvailability Circuit InformationMinimum Gauge Size 14 AWG Grounding RequirementsExtension Cords 50 ftUnpacking SetupNeeded for Setup Description QtyInventory Inventory Item QtySite Considerations Assembly To assemble your dust collectorOutlet Canister Support Installing wide foam strip 13. G0562Z/G0562ZP onlyInstalled inlet Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ G1030Z2/G1030Z2P onlyDisconnecting Power Power ConnectionConnecting Power Test Run To test run the machineMetal Duct Designing SystemGeneral Duct Material Flexible Duct Plastic DuctSketch Your Shop Layout System DesignDecide Who Will Design Sketch a Basic Duct LayoutMachine Determine Required CFM of Each MachineMachine Approximate Total CFM Branch Line Size Determining Main Line Duct SizeDetermining Branch Line Duct Size 400 500 600 700 800 900 1000Loss Per Foot Calculating Duct ResistanceDuct Approximate Dia Fitting 90˚ 45˚ Dia Elbow WyeYSystem Grounding Plastic Blast Gate Machine Storage OperationsGeneral Accessories Dust collection accessoriesMetal Duct Starter Kit Metal Elbows Metal BranchesReducers & Adapters Schedule MaintenanceBag Cleaning LubricationTo replace the collection bag Emptying/ReplacingBags Symptom Possible Cause Possible Solution ServiceTroubleshooting Motor & ElectricalDust Collector Operation Shock HAZARD. Ldg`c\dclgc\iVihXdc WiringWiring Safety Instructions XdbedcZcih#Start capacitor Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ Wiring DiagramE699AHLI8= See H5783 Parts Breakdown PartsG0562Z/G1030Z2 Main Breakdown G0562Z/G1030Z2 Main Parts List DescriptionG0562ZP/G1030Z2P Main Breakdown G0562ZP/G1030Z2P Main Parts List Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ 10. 8dbbZcih EaVXZ HiVbe =ZgZ 99.$5342!, .# 0//88 %,,.!- 7! Warranty and Returns Order Hours a DAY
Related manuals
Manual 48 pages 47.83 Kb