Grizzly G1030Z2/G1030Z2P only, Installed inlet Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+

Page 19

G1030Z2/G1030Z2P only:

a.Hook the top loop of the upper filter bags (fabric) over the upper bag sup- ports, as shown in Figure 22.

Figure 22. Attaching upper filter bag.

b.Tighten the upper bags to the col- lector using the strap and clamp kits shown in Figure 23.

Note: DO NOT force the clamp. If it will not close, choose the next notch over, then clamp in place.

Clamp

Figure 23. Upper collection bag secured.

14.Hook the clear collection bag on the hooks around the bottom of the collector to hold the bag in place for the next step.

15.Tighten the belt clamp around the narrow foam strip to seal and secure the lower col- lection bag (Figure 24).

Note: DO NOT force the clamp. If it will not close, choose the next notch over, then clamp in place.

Figure 24. Lower collection bag installed.

16.Insert the inlet over the impeller intake hole.

17.Secure the inlet in place with the Phillips head tap screw (Figure 25).

Figure 25. Installed inlet.

Model G0562Z/ZP, G1030Z2/Z2P (Mfg. 11/11+)

-17-

Image 19
Contents G0562Z G1030Z2 Dust CollectorSs ,EAD from Leadbased PAINTS Table of Contents Machine Description IntroductionManual Accuracy Contact InfoIdentification Paddle SwitchFilter Bag Motor Dust Collectors Impeller Information Safety Instructions for Machinery SafetyZghWZXdbZVYhigVXidc# Children & BYSTANDERS. @ZZe XaYgZcAdditional Safety for Dust Collectors Circuit Information Power SupplyAvailability Full-Load Current Rating50 ft Grounding RequirementsExtension Cords Minimum Gauge Size 14 AWGDescription Qty SetupNeeded for Setup UnpackingInventory Item Qty InventorySite Considerations To assemble your dust collector AssemblyOutlet Canister Support 13. G0562Z/G0562ZP only Installing wide foam stripG1030Z2/G1030Z2P only Installed inlet Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+Connecting Power Power ConnectionDisconnecting Power To test run the machine Test RunGeneral Duct Material Designing SystemMetal Duct Plastic Duct Flexible DuctSketch a Basic Duct Layout System DesignDecide Who Will Design Sketch Your Shop LayoutMachine Approximate Determine Required CFM of Each MachineMachine 400 500 600 700 800 900 1000 Determining Main Line Duct SizeDetermining Branch Line Duct Size Total CFM Branch Line SizeFitting 90˚ 45˚ Dia Elbow WyeY Calculating Duct ResistanceDuct Approximate Dia Loss Per FootSystem Grounding Plastic Blast Gate General OperationsMachine Storage Dust collection accessories AccessoriesMetal Duct Starter Kit Reducers & Adapters Metal BranchesMetal Elbows Lubrication MaintenanceBag Cleaning ScheduleBags Emptying/ReplacingTo replace the collection bag Motor & Electrical ServiceTroubleshooting Symptom Possible Cause Possible SolutionDust Collector Operation XdbedcZcih# WiringWiring Safety Instructions Shock HAZARD. Ldg`c\dclgc\iVihXdcE699AHLI8= Wiring DiagramStart capacitor Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ G0562Z/G1030Z2 Main Breakdown PartsSee H5783 Parts Breakdown Description G0562Z/G1030Z2 Main Parts ListG0562ZP/G1030Z2P Main Breakdown G0562ZP/G1030Z2P Main Parts List Model G0562Z/ZP, G1030Z2/Z2P Mfg /11+ 10. 8dbbZcih 99.$5342!, .# 0//88 %,,.!- 7!  EaVXZ HiVbe =ZgZWarranty and Returns Order Hours a DAY
Related manuals
Manual 48 pages 47.83 Kb