Grizzly G1021x owner manual Set Up Safety, Items Needed for, Unpacking

Page 13

SECTION 3: SET UP

Set Up Safety

This machine presents serious injury hazards to untrained users. Read through this entire manu- al to become familiar with the controls and opera- tions before starting the machine!

Wear safety glasses dur- ing the entire set up pro- cess!

The Model G1021X is a heavy machine. DO NOT over-exert yourself while unpacking or moving your machine—get assis- tance.

 

Items Needed for

 

Set Up

 

The following items are needed to complete the

set up process, but are not included with your

machine:

 

Description

Qty

• Straightedge 4' (or longer)

1

• Safety Glasses (for each person)

.............. 1

Dust Collection System

1

• 4" Dust Hose (length as needed)

1

4" Hose Clamp

1

• Rotacator (see Page 20)

1

Phillips Screwdriver

1

Flat Head Screwdriver

1

Forklift

1

Shop Rags

As needed

Degreaser

As needed

 

Unpacking

 

The Model G1021X was carefully packed when it left our warehouse. If you discover the machine is damaged after you have signed for delivery, please immediately call Customer Service at (570) 546-9663 for advice.

Save the containers and all packing materials for possible inspection by the carrier or its agent. Otherwise, filing a freight claim can be difficult.

When you are completely satisfied with the con- dition of your shipment, you should inventory the contents.

G1021X 15" Extreme Series Planer

-11-

Image 13
Contents Model G1021X Extreme Series Planer Page Table of Contents Warranty and Returns Foreword IntroductionContact Info Machine Data Sheet G1021X 15 Extreme Series Planer Identification Safety Instructions for Machinery SafetyAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety Instructions for Planers Circuit Requirements 220V Single-PhaseSet Up Safety SET UPSet Up Items Needed forInventory Clean UpBox 1 Figure Qty Tools and HardwareMoving & Placing Base Unit Site ConsiderationsExtension Tables To install the handwheelHandwheel Components and Hardware Needed QtyDust Port Gearbox Oil Level To install the dust hoodTo check the gearbox oil level Test Run Recommended AdjustmentsTighten V-Belts Operations Operation Safety Basic OperationBasic steps of operating the planer are as follows Feed Speed Operation TipsTo adjust the bed rollers Adjustment Height RangeBed Rollers Tools Needed QtyRotacator Precision Planer Tool AccessoriesH4979 H4977 Grizzly Dial CalipersCleaning MaintenanceSchedule BeltsTension screw locations LubricationAbout Service ServiceRotating/Changing Carbide Cutters To rotate or change a carbide cutterChain Tension To adjust the chain tensionTable Parallelism Maximum Allowable TolerancesTable Parallelism Inspection Distance Below Cutter Edge at BDC Rollers & Chip Breaker HeightsAdjustment locations for the chip Breaker Spring Tension To adjust roller spring tensionTo adjust the deflector position Chip Deflector Gap Setting QtyChip Deflector Positioning Scale CalibrationPulley Alignment Anti-Kickback FingersShould you find that the pulleys are out of alignment Motor & Machine Operation Troubleshooting GuideCutting Motor Junction Box G1021X 15 Extreme Series Planer Electrical ComponentsWiring Diagram Planer Table and Base Breakdown Gearbox Breakdown External Gearbox Breakdown Stand and Motor Breakdown Label Placement Description Parts ListBearing 6205-2RS PSS01M SET Screw M6-1 X G1021X 15 Extreme Series Planer Warranty and Returns Page Page