IDEAL INDUSTRIES 61-095 technical manual Table of Contents

Page 2

TABLE OF CONTENTS

 

Title

Page #

Introduction

1

Precautions and Safety Information

1

Symbols

1

 

 

Safety

2

 

 

Specifications

3

 

 

General Specification

3

 

 

Voltage Specifications

4

 

 

Resistance and Continuity Specifications

4

 

 

Current Specifications

4

 

 

Physical and environment characteristics

5

 

 

Certification and compliance

5

 

 

Required Equipment

6

 

 

Basic Maintenance

7

 

 

Opening the Meter Case

7

 

 

Replacing the Battery

7

 

 

Cleaning

7

 

 

Performance Tests

8

 

 

Testing the Voltage Function

8

 

 

Testing the Resistance Function

9

 

 

Testing the Amp Function

9

 

 

Calibration

10

 

 

DCV, ACV, ACA Functions

10

 

 

Calibration Adjustment Points

11

 

 

Form number TM61095

Rev 2 September 2002

Image 2
Contents Ideal INDUSTRIES, INC Technical Manual Table of Contents Precautions and Safety Information Symbols Table A. The Symbols MeaningSafety Specific precautionsSpecifications General specifications Characteristics DescriptionMeasurement Characteristics Voltage Function Range Accuracy Overload protectionEnvironmental Characteristics Description Certifications and CompliancesRequired Equipment Cleaning Basic MaintenanceReplacing the Battery Opening the Meter CaseAC Voltage Test Step Input Frequency Reading Testing the Voltage FunctionPerformance Tests DC Voltage Test Step Input ReadingAmp a Function Testing the Resistance FunctionResistance Test Step Source Reading ACA Test Step Source Frequency ReadingTop shows correct method bottom shows incorrect method ACV Calibration Adjust VR2 See FigureACA Calibration Adjust VR3 See Figure CalibrationCalibration Adjustment Points