Makita HM0870C, HM0871C dimensions Lead Unit, Handle

Page 17

P 17/ 17

Wiring diagram

Fig. D-3

Lead Unit

Pass the Lead wires of Lead unit through Polyethylene tube illustrated below.

Polyethylene Tube Ø8-30

for connecting to Switch

Connector

for connecting to Terminal block

Fig. D-4

Handle

The Lead wires have to be tightened in this area.

Connector of

Lead unit

Put the following Lead wires of Lead unit into Sponge sheet.

* Lead wire (black) for connecting to Switch * Lead wire (black) for connecting to Terminal

block

* Lead wire (white) for connecting to Switch

Sponge sheet

Terminal block

Lead unit’s Lead wires bundled with Polyethylene tube has to put under Terminal block.

Boss

Polyethylene tube

Lead unit’s Lead wires

Lead unit’s Lead wires have to be put on both side of Boss, And connect them to Switch and Terminal.

Image 17
Contents Standard equipment SpecificationOptional accessories Repair Necessary Repairing ToolsChuck section DISASSEMBLY/ASSEMBLYAssembling Repair DISASSEMBLY/ASSEMBLY 3-2 Tool holder sectionActive dynamic vibration absorber exclusively for HM0871C Tool holder sectionPipe holder a Screwdriver Piston, Striker, Cylinder Compression Crank shaft DISASSEMBLY/ASSEMBLY Cylinder section can be assembled as illustrated in . Fig Cylinder sectionArmature ControllerDISASSEMBLY/ASSEMBLY Repair Handle section Fastening torque Maintenance ProgramWiring diagram Circuit diagramHandle Lead Unit
Related manuals
Manual 28 pages 14.24 Kb