|
|
| |||
Install & | Select | Put On |
| Insert | Turn On |
Connect | Electrode | Personal Safety | Set Controls | Electrode | Welding Power |
Equipment |
| Equipment |
| Into Holder | Source |
Begin Welding |
|
|
|
|
|
|
|
|
|
| ssb7.1 9/92 |
|
|
| ||||
Install & | If Applicable, | Select | Insert | Put On |
| |
Connect | Install High_ | Tungsten | Tungsten | Personal Safety | Set Controls | |
Equipment | Frequency Unit | Into Torch | Equipment |
| ||
| Turn On | If Applicable, | Turn On |
|
|
|
Shielding Gas | Turn On High- | Welding Power | Begin Welding |
| ||
|
| Frequency Unit | Source |
|
|
|
|
|
|
|
|
| ssb8.1* 12/92 |
SECTION 5 – MAINTENANCE & TROUBLESHOOTING
5-1. Routine Maintenance
3 Months | Turn Off all power before maintaining. |
| 6 Months |
Tape Or |
|
| Blow Out |
Replace |
| OR | |
| Or | ||
Cracked |
|
| Vacuum |
Cables |
|
| |
|
| Inside | |
|
|
| |
|
| During Heavy Service, | |
Replace |
| Clean Monthly | |
Unreadable |
|
|
|
Labels |
|
|
|
Clean
And
Tighten Weld
Connections
Ref.