Saint Gobain Vidros PFD1, PFS1 manual Index

Page 2

 

PFD1/PFS1 – OPERATING INSTRUCTIONS

 

 

INDEX

 

Page

 

 

I – General

 

2

 

 

I.1 – Introduction

 

 

 

 

I.2 – Materials

 

 

 

 

I.3 – Operation description

 

 

 

 

I.4 – Pump Data

 

 

 

 

II – Quick checklist

 

2

 

 

II.1 – Shipment

 

 

 

 

II.2 – Reception

 

 

 

 

III – Installation and operation

 

3

 

 

III.1 – Testing

 

 

 

 

III.2 – Set up

 

 

 

 

III.3 – Connections

 

 

 

 

III.3.1 – Air/nitrogen connections

 

 

 

 

III.3.2 – Fluid connections

 

 

 

 

III.4 – Initial tests and Adjustments

 

 

 

 

IV – Applications

 

4

 

 

IV.1 – Chemical compatibility

 

 

 

 

IV.2 – Contamination

 

 

 

 

IV.3 – Temperature range

 

 

 

 

IV.4 – Applications

 

 

 

 

IV.5 – Limitations of use

 

 

 

 

V – Maintenance

 

5

 

 

V.1 – Trouble shooting

 

 

 

 

V.2 – Preventive maintenance

 

 

 

 

V.2.1 – Continuous operation

 

 

 

 

V.2.2 – Intermittent operation

 

 

 

 

V.3 – Comments

 

 

 

 

VI – Dismantling and Repair

 

6

 

 

VI.1 – How to dismantle

 

 

 

 

VI.2 – Examination

 

 

 

 

VI.3 – Stripping and assembling the pump

 

 

 

VI.3.1 – Replacing the shuttle valve

 

 

 

VI.3.2 – Replacing the bellows

 

 

 

 

VI.3.3 – Replacing the central shaft and shaft composite rings

 

 

 

VI.3.4 – Replacing the PTFE sleeves

 

 

 

VI.3.5 – Replacing the bellow and body O.rings

 

 

 

VI.3.6 – Replacing the manifold O.rings

 

 

 

VI.3.7 – Replacing other parts

 

 

 

 

VII – Warranty

 

11

 

 

Appendix: Spare parts list

 

 

 

 

Maintenance kits

 

 

 

 

Section view (drawing “APP 1 REF”)

 

 

 

Part numbers table (“APP 1 REF”)

 

 

 

 

General arrangement drawing (drawing “APP 1 EXT”)

 

 

 

Flow rate/discharge pressure curves

 

 

 

Pneumatic diagram (drawing “APP 1 CAB”)

 

 

 

 

 

 

 

 

INDEX

DATE

 

 

03

27/09/01

DC01020US

 

Image 2
Contents PFD1/PFS1 Headquarters FactoryIndex II Quick checklist GeneralIII.2 Set up III Installation and OperationIII.1 Testing II.2 ReceptionIV Applications IV.4 Applications MaintenanceTrouble Shooting IV.5 Limitations of useIntermittent operation VI Dismantling and RepairImportant these parts should always be replaced together CommentsVI.3 Stripping and assembling the pump VI.1 How to dismantleVI.2 Examination VI.3.1 Replacing the shuttle valve1641 Short Long Ring7135F 2680 Push Step 26801641 VI.3.5 Replacing the bellow and body O.rings 1643VI.3.4 Replacing the Ptfe sleeves VI.3.6 Replacing the manifold O.ringsVII Warranty Pumps PFD1 Series 2 & PFS1 PFD1 PFS1PFD1/PFS1 Maintenance Kits APP 1 REF Part Numbers Table Following reference combination is not relevantAPP 1 EXT Air supply 3 bar Air supply 2 bar Air supply 5 barAir supply 4 bar APP 1 CAB