| PFD1/PFS1 – OPERATING INSTRUCTIONS |
| ||
| INDEX |
| Page |
|
| I – General |
| 2 |
|
| I.1 – Introduction |
|
|
|
| I.2 – Materials |
|
|
|
| I.3 – Operation description |
|
|
|
| I.4 – Pump Data |
|
|
|
| II – Quick checklist |
| 2 |
|
| II.1 – Shipment |
|
|
|
| II.2 – Reception |
|
|
|
| III – Installation and operation |
| 3 |
|
| III.1 – Testing |
|
|
|
| III.2 – Set up |
|
|
|
| III.3 – Connections |
|
|
|
| III.3.1 – Air/nitrogen connections |
|
|
|
| III.3.2 – Fluid connections |
|
|
|
| III.4 – Initial tests and Adjustments |
|
|
|
| IV – Applications |
| 4 |
|
| IV.1 – Chemical compatibility |
|
|
|
| IV.2 – Contamination |
|
|
|
| IV.3 – Temperature range |
|
|
|
| IV.4 – Applications |
|
|
|
| IV.5 – Limitations of use |
|
|
|
| V – Maintenance |
| 5 |
|
| V.1 – Trouble shooting |
|
|
|
| V.2 – Preventive maintenance |
|
|
|
| V.2.1 – Continuous operation |
|
|
|
| V.2.2 – Intermittent operation |
|
|
|
| V.3 – Comments |
|
|
|
| VI – Dismantling and Repair |
| 6 |
|
| VI.1 – How to dismantle |
|
|
|
| VI.2 – Examination |
|
|
|
| VI.3 – Stripping and assembling the pump |
|
| |
| VI.3.1 – Replacing the shuttle valve |
|
| |
| VI.3.2 – Replacing the bellows |
|
|
|
| VI.3.3 – Replacing the central shaft and shaft composite rings |
|
| |
| VI.3.4 – Replacing the PTFE sleeves |
|
| |
| VI.3.5 – Replacing the bellow and body O.rings |
|
| |
| VI.3.6 – Replacing the manifold O.rings |
|
| |
| VI.3.7 – Replacing other parts |
|
|
|
| VII – Warranty |
| 11 |
|
| Appendix: Spare parts list |
|
|
|
| Maintenance kits |
|
|
|
| Section view (drawing “APP 1 REF”) |
|
| |
| Part numbers table (“APP 1 REF”) |
|
|
|
| General arrangement drawing (drawing “APP 1 EXT”) |
|
| |
| Flow rate/discharge pressure curves |
|
| |
| Pneumatic diagram (drawing “APP 1 CAB”) |
|
| |
|
|
|
|
|
| INDEX | DATE | N° |
|
| 03 | 27/09/01 | DC01020US |
|