PFD1/PFS1 – OPERATING INSTRUCTIONS

II.2 – Reception

Upon receipt of the pump, please check that:

The carton has not been damaged in transit. If there is any visible damage, immediately contact the carrier.

The pump is not damaged. If there are signs of damage, you should report this immediately to SGPPL ASTI or your local distributor.

An operating instruction manual has been included in each package. Please request another copy if it has not been included.

III – Installation and Operation

III.1 – Testing

All pumps are tested with DI water at the factory in our clean room for:

Maximum flow rate with no back pressure

Minimum flow rate with no back pressure

Flow rate with 58 PSI (4 bar) discharge pressure

Checked for leakage

III.2 – Set up

The pump must be installed horizontally as shown on general arrangement drawing (see appendix “APP 1 EXT”). This drawing also shows the overall dimensions of the pump etc.

The pump must be positioned on its feet. If not, the check valves will not seat correctly and the pump may malfunction.

III.3 – Connections

III.3.1 – Air/Nitrogen connection

The pump must be connected to a clean dry air or nitrogen supply. On no account should the air/nitrogen supply be lubricated, oil or water droplets will cause the shuttle valve to malfunction.

Minimum and maximum supply pressure must be between 29 and 72.5 PSI (2 and 5 bar). For optimum pump operation, we recommend a supply pressure of 51 PSI (3.5 bar).

The ID of the tube supplying the dry air/nitrogen should not exceed 3/32” (2.5 mm). The tube length between the pump and on/off valve should be between 10 feet minimum (3 m) and 20 feet maximum (6 m).

When in aggressive conditions (acid vapors), it is advised to canalize outlet with a tube of minimum ID 1/4” (6 mm).

The pneumatic on/off valve must be 3-way to ensure the shuttle valve on the pump resets itself when the pump is switched off. The flow control valve must be positioned before the 3-way on/off valve (see appendix “APP 1 CAB”).

A remote control box with on/off switch and needle valve (P/N 21 000 04) is available as an optional extra.

3/11

INDEX

DATE

03

27/09/01

DC01020US

Image 4
Contents PFD1/PFS1 Headquarters FactoryIndex II Quick checklist GeneralIII Installation and Operation III.1 TestingIII.2 Set up II.2 ReceptionIV Applications Maintenance Trouble ShootingIV.4 Applications IV.5 Limitations of useVI Dismantling and Repair Important these parts should always be replaced togetherIntermittent operation CommentsVI.1 How to dismantle VI.2 ExaminationVI.3 Stripping and assembling the pump VI.3.1 Replacing the shuttle valve7135F Ring1641 Short Long 1641 Step 26802680 Push 1643 VI.3.4 Replacing the Ptfe sleevesVI.3.5 Replacing the bellow and body O.rings VI.3.6 Replacing the manifold O.ringsVII Warranty Pumps PFD1 Series 2 & PFS1 PFD1 PFS1PFD1/PFS1 Maintenance Kits APP 1 REF Part Numbers Table Following reference combination is not relevantAPP 1 EXT Air supply 4 bar Air supply 5 barAir supply 3 bar Air supply 2 bar APP 1 CAB