|
| . Make ground lead connections |
|
| according to Section |
|
| following this procedure. |
|
| 3 |
| C D | E |
A | B |
|
1 |
|
|
|
| 2 |
|
| GND |
Tools Needed: | 2 (Red) | |
|
| 4 (Orange) |
|
| 31 (White) |
|
| 32 (Black) |
|
| 1/4 in |
1Terminal Block 1T
2Interconnecting Power Cord
3Green Lead (Connected To Ground In Section
Connect remaining leads to terminal block as follows:
A:115 VAC/Neutral Lead
B:115 VAC/Hot Lead
C:No Connection
D:Dry Contact Closure w/Respect To Terminal E Lead
E:115 VAC/Contact Closure Lead
.For welding power sources
requiring dry contact closure, move lead 38 at terminal block to terminal D.
Secure strain relief clamp around cord.
Reinstall and secure wrapper to unit.
Connect remaining end of cord to welding power source.
Ref. 802 310 / Ref. 193 749
|
| 3 |
| C | D E |
A B |
| |
|
| |
1 |
|
|
|
| 2 |
Tools Needed: | ||
|
| 1/4 in |
.Make ground lead connections
according to Section
1Terminal Block 1T
2Interconnecting Power Cord
3Green Lead (Connected To Ground In Section
Connect remaining leads to terminal block as follows:
A:115 VAC/Neutral Lead
B:115 VAC/Hot Lead
C:No Connection
D:No Connection
E:115 VAC/Contact Closure Lead
Secure strain relief clamp around cord.
Reinstall and secure wrapper to unit.
Connect remaining end of cord to welding power source.
Ref. 802 310 / Ref. 193 749