Have only qualified persons make this installation.
1 Rating Label
Supply correct input power.
18 in (457 mm) for airflow
GND/PE | L1 | L2 | GND/PE | L1 | L2 L3 |
Connect First |
|
| Connect First |
|
|
1
Have only qualified persons make this installation.
1 Rating Label
Supply correct input power.
18 in (457 mm) for airflow
GND/PE | L1 | L2 | GND/PE | L1 | L2 L3 |
Connect First |
|
| Connect First |
|
|
1