2-5. Installing Work Clamp
4
1 Work Cable
2 Boot
Slide boot onto work cable. Route cable out front panel opening from inside.
5
3 Negative
Connect cable to terminal and cover connection with boot.
4 Hardware
5 Work Clamp
Route cable through clamp handle
| 1 | and secure as shown. |
2 |
| |
| Close door. | |
|
|
3
Tools Needed:
1/2, 3/4 in
2-6. Installing Gas Supply
7
6 | 5 | 4 |
1
2
3
Tools Needed:
5/8,
1Cylinder Rack
2Chain
Obtain gas cylinder and chain cylinder to rack.
3Gas Hose Fitting
4CO2 Washer
5Regulator
Install washer and regulator onto cylinder.
6 Gas Hose Connection
Obtain gas hose with fittings and install between regulator and welding power source.
7 Flow Adjust
Typical flow rate is 20 cfh (cubic feet per hour).