. Complete Parts List available at www.MillerWelds.com
5-2. Grounding Generator When Supplying Building Systems
1 2
GND/PE
! |
Ground generator to sys-
tem earth ground if supply- ing power to a premises (home, shop, farm) wiring system.
| 1 | Equipment Grounding |
|
| Terminal |
| 2 | Grounding Cable |
| Use #10 AWG or larger insulated | |
| copper wire. | |
| . Use ground device as stated | |
2 | 3 | in electrical codes. |
| ||
| 3 | Ground Device |
800
5-3. Engine Prestart Checks − Standard Model
1
.Fuel valve is shown in the
open position. Always close fuel valve after stopping unit. Moving unit with fuel valve open may cause carburetor flooding and make starting difficult.
1/2 in |
|
(13 mm) | Full |
| |
Gasoline |
|
Full
Check all fluids daily. Engine must be cold and on a level surface. Unit is shipped with 10W30 engine oil.
1Fuel Valve Open valve.
.Close fuel valve before moving
unit or carburetor may flood and make starting difficult.
Fuel
Add fresh fuel before starting engine the first time (see engine manual for specifications). Fill fuel tank up to 1/2 in. (13 mm) from top to allow room for expansion. Check fuel level on a cold engine before use each day.
Oil
After fueling, check oil with unit on level surface. If oil is not up to full mark on dipstick, add oil (see en- gine manual).
Unit stops if oil level is too low. Unit cannot be restarted until sufficient oil is added.
Ref. 803