Miller Electric CV-2 owner manual Tungsten Preparation

Page 25
WARNING: ELECTRIC SHOCK can kill.
Do not touch live electrical parts.
Stop engine, and disconnect negative (–) bat- tery cable from battery before inspecting, maintaining, or servicing.
MOVING PARTS can cause serious injury.
Keep away from moving parts such as fans, belts, and rotors.
HOT ENGINE PARTS can cause severe burns.
Wear protective gloves and clothing when working on a hot engine.
MAGNETIC FIELDS FROM HIGH CUR- RENTS can affect pacemaker operation.
Wearers should consult with their doctor be- fore going near arc welding, gouging, or spot welding operations.
Troubleshooting of internal parts to be per- formed only by qualified persons.
IMPORTANT: Before beginning any troubleshooting procedures, check and be sure that all connections are correct and secure and that all switches are in the proper position.
OM-880 Page 21
TROUBLESHOOTING
6-5.
example, the ground surface for a 1/8 in. (3.2 mm) di- ameter tungsten electrode should be 1/4 to 5/16 in. (6.4 to 8.0 mm) long.
For additional information, see your distributor for a handbook on the Gas Tungsten Arc Welding (GTAW) process.

TUNGSTEN PREPARATION: IDEAL

Stable Arc

Straight Ground

Flat

(The Dia. Of This

Flat Governs

Amperage Capacity)

TUNGSTEN PREPARATION: WRONG

Arc Wander

Point

Radial Ground

S-0162

Figure 6-3. Tungsten Preparation

Shape tungsten electrodes on a fine grit, hard abrasive wheel used only for tungsten shaping. Grind tungsten electrodes so that grinding marks run lengthwise with the electrode. These procedures reduce the possibility of the tungsten electrode transferring foreign matter into the weld and help reduce arc wander.

Grind the end of the tungsten electrode to a taper for a distance of 2 to 2–1/2 electrode diameters in length. For

Image 25
Contents OWNER’S Manual From Miller to You Table of Contents Page Specifications Safety Precautions and Signal WordsGeneral Information and Safety Safety Alert Symbol and Signal WordsBIG 50 Diesel Models BIG 40 Diesel And BIG 40G ModelsCV-2 Installation Installation or RelocationDescription BIG 30 Diesel Cable Selector Switch S1 AC Connections OM-880 REMOTE-5 Final ProcedureREMOTE-5 Receptacle Information and Connections -6 REMOTE-14 Receptacle Information and Connections Figures 3-7 REMOTE-14Amphenol Electrode Cable Series Current CC Switch Figure Current Control Switch FigureOperator Controls Current Control RemoteElectrode POS NEG Output Contactor RemoteCircuit Breaker GAS Metal ARC Gmaw and Flux Cored ARC Welding Fcaw Sequence of OperationGAS Tungsten ARC Welding Gtaw Shielded Metal ARC Welding SmawShutting Down Maintenance & Troubleshooting Tungsten Electrode -2, And Figures 6-2 Excessive Pressure can break circuit boardFor AC or DC Electrode Positive Welding Fig- ure Thorium Alloyed Tungsten Red Band Green BandZirconium Alloyed Tungsten Brown Band Tungsten Preparation Trouble Probable Remedy TroubleshootingDiagram 7-2. Wiring Diagram For CV-2 Electrical DiagramParts List Main Assembly Dia Part Description Quantity Mkgs Call Miller for your local Miller distributor Miller Electric Mfg. Co Owner’s Record