Hitachi H 90SB instruction manual Operation, HOW to Replace Grease, Maintenance and Inspection

Page 8

NOTE:

Use a manual hammer to open/close the retainer as it is too heavy to move by hand.

Fig. 2

Fig. 3

NOTE:

When removing the accessory, such as a bull point, a cutter etc., follow the above procedure in reverse order.

OPERATION

1.Pull the trigger switch after applying the tip of the bit to the crushing position.

In some cases, it is necessary to punch the tip of the bit against the crushing position forcibly in order to begin the striking stroke.

This is not due to malfunction of the power tool. It means that the safe guard mechanism against no-load striking is working.

2.Operate this demolition hammer by utilizing its own weight. The performance will not be better even if it is pressed or thrust forcibly against the work surface.

Hold this demolition hammer with a force just sufficient to counteract the reaction.

CAUTION:

Sometimes the power tool does not begin the striking stroke even when the motor rotates because oil has become thick.

If the power tool is used at low temperatures or if it is used after a long idle time, this demolition hammer should be kept running for about five minutes in order to warm it up.

HOW TO REPLACE GREASE

This Demolition Hammer is full air-tight construction to protect against dust and to prevent lubricant leakage. Therefore, this Demolition Hammer can be used without lubrication for long periods. Replace the grease as described below.

Grease Replacement Period:

After purchase, replace grease after every 6 months of usage.

Ask for grease replacement at the nearest authorized service center.

MAINTENANCE AND INSPECTION

CAUTION:

Be sure to disconnect the plug before and during maintenance and inspection.

1.Inspecting this demolition hammer

Use of a dull accessory, such as a bull point, a cutter, etc., will cause motor malfunctioning and efficiency degraded. Replace with a new one without delay when abrasion is noted.

7

Image 8
Contents Demolition Hammer Model H 90SB Page Page Service and Repairs Polarized PlugsParticular Precautions on Demolition Hammer Double Insulation System Enhances Safe OperationSpecifications AccessoriesStandard Accessories Name of PartsApplication Prior to OperationHOW to Replace Grease Maintenance and InspectionOperation Inspecting this demolition hammerInspecting the mounting screws Inspecting the retainerInspecting the carbon brushes Fig Replacing a carbon brushPage Part Name Roll Pin D6 ⋅ Lever Pin Bolt Itachi Koki Canada Co