Fig. 5 Wiring Diagram for Honeywell S89F

SEQUENCE OF OPERATIONS

Honeywell S89F

1.Limits close.

2.Blower motor starts as the 24 Volt transformer powers the airflow switch.

3.Power from the airflow switch to the S89F control initiates 34 second pre-purge.

4.At the end of the pre-purge, the spark is energized for 4 seconds. At the same time, the 24 Volt transformer powers the gas valve, allowing the fuel to flow.

5.Within 4 seconds, the flame should be established and proved. The spark will shut off and the control will hold power to the gas valve until the limits open and the burner stops firing.

6.If the flame is not established, the blower motor continuously runs.

7.To restart, power should be interrupted for five minutes. Then turn on the power to start this sequence again.

Image 10
Contents Manual for SU-2A Gas Burner Chart 1 Natural Gas and LP Burner DescriptionConverting Coal to GAS Chart 2 Minimum Firing Chamber DimensionsConverting OIL to GAS AIR for CombustionChimney and Fresh Air Dimensions Chimney RequirementsInstalling the Burner Vent Pipe and Draft Hood SizesGAS Service & Pipe Capacity Gas Burner Piping Installing the Chimney LINER, Draft Diverter Vent Pipe Orifice InstallationChart 5 Burner Orifice Sizing For Natural Gas And LP Electric Wiring Fenwal 2466HWiring Diagram for Honeywell S89F Honeywell S89FTo light the SU-2A Gas Burner Reset, if Flame Lockout OccursBurner Operation Record the Readings at Steady State To shut the burner offWhen to adjust the Air When to adjust the HeadBurner locks out after 4 seconds CO content is too highBurner motor runs Pulsation at start5SAY To be FIXED/ATTACHED Near Burner