HP Z800 manual Connections Overview, Connecting the Graphics Monitor, Connecting Peripherals

Page 16

Connections Overview

The following diagram provides an overview of the adapter card positions and general connection requirements for the HP Z800 workstation.

HP Z800 Workstation

To keyboard, mouse, tablet, monitor calibrator

To Lustre control surface

To house network

GigE Adapter to SAN and/or private network, Incinerator node

Atto Celerity FC84-EN

to direct attached storage

Qlogic DDR InfinBand to Wire network, Lustre Media Server (optional)

Power

Nvidia Quadro FX 5800

To graphics monitor

AJA OEM-2K

to video/audio i/o, VTR

Nvidia Quadro SDI Output to reference monitor, Real- Time Deliverables VTR, sync generator

NOTE This diagram illustrates a 2-port GigE adapter in slot 1. You also have the option of using a 10-GigE adapter or a second ATTO Fibre Channel adapter in slot 1. On the HP Z800 workstation, the slots are numbered 1–7 from top to bottom. Note also that a number of HP Z800 workstations shipped with a 4-port GigE adapter instead of the 2-port adapter.

Connecting the Graphics Monitor

The graphics monitor connects to the Nvidia® Quadro® FX 5800 graphics adapter card. This is also an opportunity to connect the graphics adapter to its add-on card, the Nvidia Quadro SDI Output adapter.

To connect the monitor:

1Use the short DVI cable (included in TP.FX5800DI) to connect port 1 of the Nvidia Quadro FX 5800 graphics adapter card to the DVI port of the Nvidia Quadro SDI Output adapter (the add-on card).

12 Chapter 3 Connecting Peripherals

Image 16
Contents HP Z800 Workstation Hardware Setup Guide Trademarks Contents Iv Contents Setting Up Video HardwareAbout This Guide IntroductionRelated Documentation Notation Conventions Contacting Customer SupportIntroduction Convention ExampleGetting Started General WorkflowGetting Started Workstation Typical Configuration Overview for Autodesk Lustre Control Surface Lustre Master WorkstationHardware Configuration Guidelines Power and Air Conditioning RequirementsHardware Configuration Guidelines Memory RequirementsRack Mount Requirements Component Quantity Startup Amps Cont. Amps Watts120V 240V Unit Conversion ExampleAvoiding Damage from Static Electricity Grounding Audio Hardware ComponentsReceiving Your Shipment Avoiding Damage from Static ElectricityPage Connecting Peripherals Workflow for Connecting PeripheralsConnecting the Graphics Monitor Connecting PeripheralsConnections Overview To connect the monitorConnecting the Graphics Monitor Calibration Device Connecting the Keyboard, Mouse, and TabletConnecting the Keyboard, Mouse, and Tablet To enable the Eye-One calibration utility driver Network ConnectionsVisual Effects and Finishing Workstation Connect the built-in GigE port as followsConnecting the Autodesk Control Surface Lustre WorkstationLustre Workstation Connect the GigE adapter as followsHP Z800 Workstation Connecting the Slave Renderer to a Lustre WorkstationTo connect the Autodesk Control Surface Connecting the Slave Renderer to a Lustre Workstation To connect the Slave RendererPage Video Hardware Components Setting UpVideo Hardware4Included Components Wiring Your Video Components Setting Up Video HardwareSetting Up VTR Emulation Setting Up VTR EmulationTo configure hardware for VTR emulation SettingUpAudioHardware5 Audio Wiring WorkflowTo wire the audio subsystem About AudioSetting Up Audio Hardware Audio WiringAudio Hardware Components Configuring the Lucid ADA 88192 Converter Configuring the Lucid ADA 88192 ConverterAdjusting Lucid ADA 88192 Converter Settings To navigate menus and adjust settingsTo reset all settings to their factory defaults Do thisLucid ADA 88192 Converter Settings for Remote Control Lucid ADA 88192 Converter Settings for Local ControlLucid ADA 88192 Converter Settings for Remote Control Menu Menu Item CommentKeyword Setting AJAConnecting Media Storage Connecting StorageOverview Connecting Storage Connecting the HP Z800 Atto Fibre Channel AdapterStorage Configuration Loops Expected Peformance Connecting the HP Z800 Atto Fibre Channel Adapter Connecting Storage Enclosures XR 6500 Wiring DiagramsConnecting Storage Enclosures Single XR 6500 RAID enclosure, 4 loopsXR 6412 Wiring Diagrams Single XR 6412 RAID enclosure, 2 loopsSingle XR 6412 RAID enclosure, 4 loops XR 5402 and XR 5412 Wiring Diagrams Connecting Archiving Storage Connecting Archiving StorageFilesystem Devices Scsi Tape Drive DevicesConnecting Storage Scsi Tape Drive Devices Page HP Z800 Bios Settings Configuring Workstation BiosBios Menu Submenu Value Configuring the Workstation Bios Restoring Bios to Default Factory SettingsTo restore default factory Bios settings Updating your System Bios Updating your System BiosTo update the Bios on your workstation Workstation reboots VTR Control Cable Pinouts Standard VTR Control Cable PinoutsLinuxAJA VTR Emulation RS-422 Control CablesAppendix a VTR Control Cable Pinouts LinuxAJA Master LinuxAJA Emulator Linux Master to Linux EmulatorLinux Master to Linux Emulator Third-Party Master to Linux Emulator VTR-Emulation Control CableIndex IndexRAID