Sterling STT 160 manual STT 110 / STT Tansport and Packing

Page 42

STT 110 / STT 160

7.1. Tansport and Packing

»

F

Please ensure adequate carrying capacity of the lifting equipment. Note that the dryer system is top-heavy. Risc of toppling!

The machine must not be tilted or laid on its side.

The equipment pass a rigorous operating test in the factory and are packed carefully to avoid transport damage.

Please check packing on delivery for transport damage.

The inlet and discharge flanges are sealed with plugs, so that no dirt can enter during transport. Plugs must be removed before assembly.

Packing materials should be disposed of according to environmental laws or reused.

The dryer or the compact unit is delivered on a pallet.

The dryer should only be moved by means of the appropriate lifting equipment (e. g. a fork lift truck or a workshop crane).

Fasten the transport cables to the eyelets of the control cabinets.

Transport must be shock-proofed and free from vibrations.

SM2-605

Transport, Assembly and Storage 7-2

Image 42
Contents Operating Instructions Dehumidified air dryer STT Sterling Material ProcessingParts and Service Department STT 110 / STT Sterling Material Processing Edition 04/02STT 110 / STT Table of contents Technical Data Transport, Assembly and StorageAssembly instructions Spare parts list Electrical manualGeneral Information General InformationSTT 110 / STT STT 110 / STT CTT 110 / CTT Explanations and information Legal basisFields of applications Safety instructions Safety instructionsSTT 110 / STT For your safety GeneralAssembly OperationMaintenance STT 110 / STT For the safety of the devices Start up Start upFor operation without timer clock Switching on the DryerFor operation with timer clock optional STT 110 / STT Initial OperationExit Switching the Dryer on STT 110 / STT Continuous OperationSTT 110 / STT Setting the Drying Temperature Exit Optimizing the thermo regulatorSTT 110 / STT Switching the Dryer off Error and error correction Error and error correctionFollowing errors can lead to an alarm Blower Regeneration heaterHopper heater Maintenance MaintenanceSTT 110 / STT STT 110 / STT Maintenance schedule STT 110 / STT Cleaning or Replacing the Air Filter STT 110 / STT Cleaning or Replacing the Return Air Filter STT 110 / STTSTT 110 / STT Disposing of Drying Agents STT 110 / STT Cleaning the Drying Hopper STT 110 / STT ST 60 ST Functional description Functional descriptionSTT 110 / STT General Information STT 110 / STT STT 110 / STT STT 110 / STT Drying Hopper Optional 180 STT 110 / STT Hopper HeaterReturn Air Cooler Optional Transport, Assembly and Storage Transport, Assembly and StorageSTT 110 / STT Tansport and Packing STT 110 / STT Assembly StorageAssembly instructions Assembly instructionsGrounding the equipment against electrostatic charging STT 110 / STT Electrical Connection STT 110 / STT Connection of Return Air Cooler Optional STT Technical DataTechnical Data Return Air CoolerSTT 110 / STT STT 110 / STT Dimension Sheet Spare parts list Spare parts listSTT 110 / STT Pos ID-number DescriptionReturn air cooler optional Operating unit Pos ID-number Description Control unit Electrical manual Electrical manualAccessories AccessoriesBasic setting thermo regulator CodeParameter Parameter set
Related manuals
Manual 57 pages 29.35 Kb