Note
Note
Installation
Fluid Cooler Installation
These installation instructions are intended to help you prepare be- fore your fluid cooler arrives. If discrepancies exist between these instructions and those shipped with the fluid cooler, the instructions shipped with the fluid cooler will govern.
1.Prior to placement of the fluid cooler, confirm that the supporting platform is level, and that the anchor bolt holes are correctly located in accordance with Marley drawings.
2.Place bottom module on your prepared supports, aligning anchor bolt holes with those in your supporting steel. Make sure that the orienta- tion agrees with your intended piping arrangement. Attach fluid cooler to supporting steel with 13mm diameter bolts and flat washers (by others). See support drawing for location and quantity. Position flat washers between the bolt head and the fluid cooler basin flange.
3.Before setting top module in place on bottom module, clean any debris from the underside of the top module, skid and beams and from the top of the bottom module. Apply the mastic sealing strip supplied with the fluid cooler according to the MC Fluid Cooler Field Installation Drawing instructions. Place top module on the top peripheral bearing surface of bottom module, aligning mating holes as it is set in place. Attach top module to bottom module with fasteners provided accord- ing the MC Fluid Cooler Field Installation Drawing instructions.
4.Connect the recirculation piping with rubber coupling shipped with the bottom module piping according to drawings shipped with you fluid cooler.
5.Attach makeup water supply piping to
Fasteners and components provided by others that are to be attached to the tower must be compatible with the fluid cooler materials— i.e. fasteners in a stainless steel cold water basin must be stainless steel.
➠
7