York 150, 120 Electric Heating Sequence of Operations, Electric Heating Operation Errors

Page 36

035-17311-002-A-0803

a compressor too soon after its previous run. Additionally, a minimum run time is imposed any time a compressor is ener- gized.

The ASCD is initiated on unit start-up and on any compressor reset or lock-out.

FLASH CODES

The UCB will initiate a flash code associated with errors within the system. Refer to UNIT CONTROL BOARD FLASH CODES 37.

RESET

Remove the call for cooling, by raising thermostat setting higher than the conditioned space temperature. This resets any pressure or freezestat flash codes.

ELECTRIC HEATING SEQUENCE OF OPERATIONS

The following sequence describes the operation of the elec- tric heat section.

Two-stage heating:

a.Upon a call for first stage heat by the thermostat, the heater relay (RA) will be energized. After completing the specified fan on delay for heating, the UCB will energize the blower motor. If the second stage of heat is required, heater relay (RB) will be energized. After completing the specified fan on delay for heat- ing, the UCB will energize the blower motor.

b.The thermostat will cycle the electric heat to satisfy the heating requirements of the conditioned space.

ELECTRIC HEATING OPERATION ERRORS

TEMPERATURE LIMIT

If the UCB senses zero volts from the high temperature limit, the indoor blower motor is immediately energized.

This limit is monitored regardless of unit operation status, i.e. the limit is monitored at all times.

If the temperature limit opens three times within one hour, it will lock-on the indoor blower motor and a flash code is initi- ated (See Table 37).

SAFETY CONTROLS

The UCB monitors the temperature limit switch of electric heat units.

The control circuit includes the following safety controls:

LIMIT SWITCH (LS)

This control is located inside the heater compartment and is set to open at the temperature indicated in the Electric Heat

Limit Setting Table 32. It resets automatically. The limit switch operates when a high temperature condition, caused by inad- equate supply air flow occurs, thus shutting down the heater and energizing the blower.

TABLE 32: ELECTRIC HEAT LIMIT SETTING

 

 

 

LIMIT

UNIT (TONS)

VOLTAGE

HEATER kW

SWITCH

 

 

 

OPENS °F

 

 

 

 

7.5

 

9

150

 

 

 

 

7.5, 10, 12.5

 

18

150

 

 

 

 

7.5, 10, 12.5

380

24

150

 

 

 

 

7.5, 10, 12.5

 

34

150

 

 

 

 

10, 12.5

 

54

130

 

 

 

 

FLASH CODES

The UCB will initiate a flash code associated with errors within the system. Refer to UNIT CONTROL BOARD FLASH CODES Table 37.

RESET

Remove the call for heating by lowering the thermostat set- ting lower than the conditioned space temperature.This resets any flash codes.

ELECTRIC HEAT ANTICTPATOR SETPOINTS

It is important that the anticipator setpoint be correct. Too high of a setting will result in longer heat cycles and a greater temperature swing in the conditioned space. Reducing the value below the correct setpoint will give shorter “ON” cycles and may result in the lowering of the temperature within the conditioned space. Refer to Table 33 for the required electric heat anticipator setting.

TABLE 33: ELECTRIC HEAT ANTICIPATOR SETPOINTS

 

SETTING, AMPS

 

 

 

W1

 

W2

 

 

 

0.13

 

0.1

 

 

 

36

Unitary Products Group

Image 36
Contents Installation Manual Table of Contents List of Figures List of Tables Safety Considerations GeneralInspection Reference½ 12½ Ton Predator Model Number Nomenclature NomenclatureNOMENCLATURE, Additonal Options Johnson UNT Controller, DFS, APS & Phase Monitor Technicoat Condenser Coil, Phase Monitor, & Coil Guard Installation Installation Safety InformationPreceding Installation Unit Temperature Limitations LocationRigging and Handling Point Load Weight Length of Forks Must be a Minimum of 60 InchesUnit Dimensions Unit Clearances Detail CBottom Duct Openings from Above Ductwork Duct CoversSide Panels with Hole Plugs Condensate Drain Thermostat Wiring Control Wire SizesPower and Control Wiring Power Wiring DetailElectronic Thermostat Field Wiring RLA LRA FLA Electrical Data DM120 10 TON with Power Convenience Outlet 380 11.5 75.0OPTIONS/ACCESSORIES Physical DataMinimum Supply AIR CFM Power Exhaust Minimum Position AdjustmentEnthalpy SET Point Adjustment EconomizerEnthalpy SET Point Chart Phasing Blower RotationSupply AIR Limitations Belt Tension1/2 TON Standard Motor Down Shot Blower PERFORMANCE* † 1/2 TON Optional Motor Down Shot Blower PERFORMANCE* †10 TON Standard Motor Down Shot Blower PERFORMANCE* † 10 TON Optional Motor Down Shot Blower PERFORMANCE* †12-1/2 TON Standard Motor Down Shot Blower PERFORMANCE* † 12-1/2 TON Optional Motor Down Shot Blower PERFORMANCE* †1/2 TON Standard Motor Side Shot Blower PERFORMANCE* † 1/2 TON Optional Motor Side Shot Blower PERFORMANCE* †4965 12-1/2 TON Standard Motor Side Shot Blower PERFORMANCE* † 12-1/2 TON Optional Motor Side Shot Blower PERFORMANCE* †Indoor Blower Specifications AIR BalanceChecking AIR Quantity Method ONE Method TWODRY Coil Delta P Supply AIR Drive Adjustment Operation Additional Static ResistanceMotor Sheave Datum Diameters Sequence of Operations OverviewCooling Sequence of Operation Safety Controls Compressor ProtectionElectric Heating Operation Errors Electric Heat Limit SettingElectric Heating Sequence of Operations Electric Heat Antictpator SetpointsSTART-UP Cooling Charging the Unit10 TON Standard Efficiency Superheat Charging 12.5 TON Standard Efficiency Superheat ChargingNormal Maintenance Troubleshooting GeneralPredator Flash Codes Basic Troubleshooting Flowchart Unit Control Board Flash CodesCooling Troubleshooting Guide Unitary Products Group 035-17311-002-A-0803 Unitary 5005 Norman Products York Group Drive 73069