York
2000
installation instructions
511.06-N5Y Unitary Products Group
Install
Power and Control Wiring
Maintenance
Options / Accessories
Page 15
511.06-N5Y
Unitary Products Group
15
Page 14
Page 16
Image 15
Page 14
Page 16
Contents
Reference
General
Approvals
Inspection
Table of Contents
Clearances
Installation
Rigging and Handling
Location
Condensate Drain
Service Access
Power and Control Wiring
Filters
Electric Heaters
Optional Economizer Rain Hood
Economizer Rain Hood Assembly Option
Supply AIR
Weights LBS
Options / Accessories
Models BCH
Return AIR
DIA Control Wiring Side or Bottom Power Wiring
Utilities Entry Data
Knockout Hole Size Used for
BCH CFM RPM
Model AIR Flow
MED
BHN CFM RPM
Model Motor
BCH Speed CFM
Blower Circuit Size Breaker BCH Supply Motor Ampacity
MIN MAX RLA LRA FLA Amps
MIN MAX RLA LRA FLA
Operation
Lockout Control
Checking Supply AIR CFM
Turns Blower Drive Range RPM Open TON
Maintenance
Normal Maintenance
1000 1500 2000 2500 3000
511.06-N5Y Unitary Products Group
Models only
Related manuals
Manual
24 pages
58.42 Kb
Related pages
Hardware troubleshooting for HP PRO X476 MFP
Specifications for Jensen VM9215BT
Fault code Malfunction for Electrolux ESF 43010
Broiling Chart for Whirlpool W10121768B
Appendix How to apply the Apache License to your work for Epson Z9870UNL
Installation for Daewoo KOR-63X5
Parts list-Overall for Lenovo 13
Language code list for Toshiba RD-XS24SB
VGA heatsink assembly for Lenovo G41
Tap S Beam and drag the S Beam switch to the right for Samsung SM-G900FZDVILO
What does the energy saving status display?
See the details
Top
Page
Image
Contents