GOVERNOR GASKET | GOVERNOR |
(SPECIAL GASKET, | 130 PSI |
SEE NOTE 6) |
|
SMALL
SPRING
LARGE
FIGURE 6 - AD-IS® AIR DRYER DELIVERY CHECK VALVE
ASSEMBLY
1.Lubricate the smaller
2.Install this
3.At the other end of the check valve body, the spring is installed over the set of 4 straight guide lands. When the spring has been pushed to the correct location, the check valve body is designed to hold the end of the spring in position - be sure that the spring is not loose before continuing with this installation.
4.Install the assembled check valve
5.Grease the adapter and the remaining larger
6.Position gasket, insert bolts through the governor and tighten (to 125
7.Reattach line to the governor.
8.Before placing vehicle back into service, check to see that the system pressure now builds to full operational pressure.
TESTING THE EVERFLOW™ ASSEMBLY AIR DRYERS
Before placing the vehicle in service, perform the following tests.
1.Close all reservoir drain valves.
2.Build up system pressure to governor
3.“Fan” the service brakes to reduce system air pressure to governor
4.It is recommended that the total air system be tested for leakage to assure that the
See Bendix publication BW5057 “Air Brake Handbook.”
9