AIR DRYER
GOVERNORS
ARE NON-
ADJUSTABLE
AND FEATURE A
BREATHER VALVE
IN THIS PORT
PRESSURE
PROTECTION
VALVE
LOCATIONS
FIGURE 4- PRESSURE PROTECTION VALVE LOCATIONS
WARNING:
DO NOT ATTEMPT TO ADJUST OR
SERVICE THE PRESSURE PROTECTION
VALVES. INCORRECT PRESSURE PROTECTION VALVE SETTINGS CAN RESULT IN AUTOMATIC APPLICATION OF VEHICLE SPRING BRAKES WITHOUT PRIOR WARNING.
TESTING THE
Before placing the vehicle in service, perform the following tests.
1.Close all reservoir drain valves.
2.Build up system pressure to governor
3.“Fan” the service brakes to reduce system air pressure to governor
4.It is recommended that the total air system be tested for leakage to assure that the
See Bendix publication BW5057 “Air Brake Handbook" for additional information.
BRAKING SYSTEM PROTECTION
The
vehicle with a limited number of reduced braking capacity applications before the parking brakes automatically apply and stay on.
ROADSIDE INSPECTION
In the event of a roadside inspection the system behavior will be as follows: When the system is charged to governor
TEMPORARY AIR DRYER BYPASS
To temporarily bypass the EverFlow™ assembly, the following procedure needs to be followed.
Follow the General Safety Guidelines outlined on pages
Make sure that all residual pressure has been released and the air dryer purge reservoir has been drained to 0 p.s.i., then remove the air supply line from the compressor to the inlet port (1 IN). Remove the safety valve from the
Note: This is a temporary bypass of the air dryer, and full repair of the unit must be carried out at the earliest opportunity. With the EverFlow™ assembly removed from the system, contaminants will be entering the air system: reservoirs will need to be manually drained daily until the repairs are completed. At end of each working day, park vehicle and slowly drain pressure through the drain valves – leave open to the atmosphere, for several hours if possible. When repairs are carried out, be sure to check that all reservoirs (including the air dryer purge reservoir) are emptied of all contaminants.
If after bypassing the EverFlow™ assembly the system pressure still does not build, use the following procedure to remove, clean and reinstall the delivery check valve.
DELIVERY CHECK VALVE CLEANING PROCEDURE
(Note: This is only required if system pressure does not build after temporary bypass is completed.)
Refer to Figure 6 throughout this procedure. Depressurize the air brake system following the General Safety
7