Lennox International Inc installation instructions Installation Instructions EL280DF

Page 1

E 2012 Lennox Industries Inc.

Dallas, Texas, USA

DOWNFLOW

AIR FLOW

INSTALLATION

INSTRUCTIONS

EL280DF

MERIT® SERIES GAS FURNACE

DOWNFLOW AIR DISCHARGE

506896−01

 

08/2012

Litho U.S.A.

This is a safety alert symbol and should never be ignored. When you see this symbol on labels or in manuals, be alert to the potential for personal injury or death.

THIS MANUAL MUST BE LEFT WITH THE HOMEOWNER FOR FUTURE REFERENCE

WARNING

Improper installation, adjustment, alteration, service or maintenance can cause property damage, person- al injury or loss of life. Installation and service must be performed by a licensed professional installer (or equivalent), service agency or the gas supplier.

CAUTION

As with any mechanical equipment, personal injury can result from contact with sharp sheet metal edges. Be careful when you handle this equipment.

Table of Contents

Unit Dimensions

2

Venting

11

EL280DF Gas Furnace

3

Gas Piping

16

Shipping and Packing List

3

Electrical

18

Integrated Control

23

Safety Information

3

Unit Start−Up

24

Use of Furnace as a Construction Heater

4

Gas Pressure Adjustment

25

 

 

General

4

Proper Combustion

26

Combustion, Dilution & Ventilation Air

5

High Altitude

26

Downflow Installation

8

Other Unit Adjustments

27

Heating Sequence of Operation . . .

28

Setting Equipment

9

Service

29

 

 

Filters

10

Repair Parts List

30

 

 

Duct System

11

Start Up and Performance Checklist

31

08/12

 

506896−01

*2P0812*

Page 1

*P506896-01*

 

 

Image 1
Contents Table of Contents Installation Instructions EL280DFTOP View Unit Dimensions − inches mmEL280DF Gas Furnace Safety InformationShipping and Packing List General Use of Furnace as Construction HeaterCombustion, Dilution & Ventilation Air Equipment in Confined Space ALL AIR from Inside Equipment in Confined Space NON−COMBUSTIBLE Floor Opening Size Downflow InstallationCombustible Floor Opening Size Setting Equipment Filters Venting Duct SystemTables for installations Mm of connector diameter as follows MIN MAX FAN + FAN FAN + NAT Carbon Monoxide Poisoning Hazard Gas PipingGas Pipe Capacity − ft3/hr m3/hr Electrical Interior MAKE−UP BOX InstallationElectrostatic Discharge ESD Page Field Wiring Applications OFF EL280DF Schematic Wiring Diagram TWO−STAGE Integrated Control Integrated ControlUnit Start−Up For Your Safety Read Before LightingGAS Meter Clocking Chart Gas Pressure AdjustmentEL280DF DialHigh Altitude Proper CombustionHeat FAN-OFF Time in Seconds Other Unit AdjustmentsHeating Sequence of Operation Electrical SHOCK, Fire Or Explosion Hazard ServiceEL280DF BURNER, Combustion AIR Inducer Assembly Repair Parts ListHeat Exchanger Removal Start−Up & Performance Check List Temperature Rise Cooling ModeUnit Operation Drain Line
Related manuals
Manual 7 pages 17.85 Kb