Start−Up & Performance Check List
UNIT SET UP
(typical)
2
2
Unit Model Number_______________
Serial Number___________________
Line Voltage
5
SUPPLY |
AIR |
upflow furnace shown
1
Gas Supply Pressure
1
4
3
Filter
RETURN
AIR
1GAS SUPPLY
Natural Gas | LP/Propane Gas |
Piping Connections Tight
Leak Tested
Supply Line Pressure .C.________
2VENT / EXHAUST PIPE
Secure to Unit
Elbows Secured to Pipe
Roof Flashing (water tight)
Vent Pipe Supported
3DUCT SYSTEM
SUPPLY AIR DUCT
Sealed
Insulated (if necessary)
Registers Open and Unobstructed
RETURN DUCT
Sealed
Filter Installed and Clean
Grilles Unobstructed
4INTEGRATED CONTROL
DIP Switches Set (if applicable) Appropriate Links in Place (if applicable)
5VOLTAGE CHECK Supply Voltage _____
Electrical Connections Tight
Page 31