Raypak manual Heater Sequence of Operation, Models 992B-1262B

Page 34

Fig. 31: Status LED Indicator Decal

Heater Sequence of Operation

Models 992B-1262B

1.The black (hot) wire lead goes directly to the main power switch. This black toggle switch is located at the middle front of the control compartment.

2.When the main power switch is placed in the “ON” position, 120 VAC is applied to the 120 VAC termi- nal block on the circuit board and the 120/24 VAC transformer is powered.

3.120 VAC is waiting at the N.O. contacts of the Economaster II pump delay.

4.Terminals L1 and F1 of the ignition module are powered with 120VAC.

5.120 VAC power is also applied to the control power connector on the circuit board.

6.120 VAC power is waiting at the N.O. contacts of K-3 relay to energize the heater blower.

7.The 120/24 VAC transformer outputs 24 VAC.

8.24 VAC is sent to pin L1 of the low water cut-off (optional) and the red power light is energized.

9.24 VAC is applied to the blue power light located on the status display board.

10.24 VAC is also applied to the red LED safety shut- down light on the status display board until the safeties have been proven.

11.24 VAC is applied to the alarm circuit (optional). If the E-5 sales option (Alarm) is included a 5 sec- ond time delay relay will not allow the alarm to sound unless a safety or limit circuit stays ener- gized for more than 5 seconds.

12.Power is applied to terminal P1-1 of the Universal Diagnostics Board. 24 VAC power is then applied in series to all typically closed safeties wired into the heater. All safeties are verified to ensure that it is safe to operate the heater. The safety compo- nents wired into the diagnostic board are: low water cut-off (optional), blocked vent switch, man- ual vent temp switch (optional), manual reset high limit, low gas pressure switch, high gas pressure switch (optional), and auto-reset high limit (option- al).

13.If any of the safeties do not close, a signal is sent to the Universal Diagnostics Board to indicate a safety fault.

14.Power is applied to terminal TP-1 of the Economaster II pump delay to energize the circuit board.

15.Once all safeties are closed and verified, a 24 VAC signal is output from the Auto High Limit to J5 pin 3 of the CPW board of the heater.

16.24 VAC power is now sent to the coil of relay K-1.

17.Relay K-1 (N.C.) will now be energized, and opens the N.C. contacts to disable the alarm (optional) and turns off the red LED safety shutdown light on the front status board.

18.The common terminal of the Auto High Limit will now send a 24 VAC signal to pin 1 of the “panel switch”.

19.The “panel switch” (rocker switch) located at the lower left front of the control compartment is now powered. If the switch is “ON” and there is no call for heat (CFH), the heater is in standby mode.

20.After the standby switch is placed into the “ON” position, a 24 VAC signal is sent to the “enable/disable” connection (normally jumpered).

21.24 VAC switched power is applied to the S24V ter- minal on the ignition module.

22.When the “enable/disable” contacts are closed, the 24 VAC signal travels to pin 1 of the stage 1 connection and waits for a CFH.

23.When a CFH occurs, a 24 VAC signal is sent to the CFH light on the status panel located on the lower left front of the control compartment.

34

Image 34
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Product Receipt Before InstallationInstallations at Elevation Model IdentificationComponent Locations Component Locations BackValves General InformationModel Quantity Vent Size Gas Burners Blowers Model Burners per Valve Stages Fire at StageTime/Temperature Relationships in Scalds General SafetyWater Time to Produce Serious Temp Burn Equipment Base InstallationInstallation Codes StackingTable D Vent/Air Inlet Termination Clearances Outdoor Installations Indoor InstallationsClearances Direct Vent Combustion and Ventilation AirReversing Air Filter Indoor UnitsTruSeal Combustion Air InstallationsConventional Combustion Air Supply All Air from Inside the BuildingGeneral Canadian InstallationsWater Piping Reversing Water ConnectionsRelief Valve Piping Hydrostatic Test Cold Water OperationHydronic Heating Temperature & Pressure GaugePump Selection Air-Separation/Expansion Tank Pressure Drop in Feet of Head Feedwater RegulatorPiping Three-Way ValvesPotable Water and Space Heating Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterPH of Water Gas SupplyPool/Spa Water Chemistry Water Hardness Total Dissolved SolidsModel Gas Supply ConnectionReversing Gas Supply Connection Table I Maximum Equivalent Pipe LengthGas Supply Pressure Electrical Power ConnectionsCheck the Power Source Field-Connected ControllersField Wiring Connection Making the Electrical ConnectionsOn-Off Wiring Connections Model Diameter Order Number VentingFlue Exhaust Tee Appliance CategoriesCombustion Exhaust Support of Vent StackVent Terminal Location Certified Combustion AirCanadian Installations InstallationsChanging the Flue Outlet Installation Venting Installation TipsVenting Configurations Natural Draft Vertical Venting CategoryCertified Vertical Venting Combustion Air Air Inlet Model TerminationCommon Venting System HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryVenting Direct Vent Horizontal Through- the-WallModel Certified Maximum Combustion Air Inlet EquivalentDirect Vent Vertical Direct Vent VerticalControls Outdoor InstallationFreeze Protection Heater Sequence of Operation Models 992B-1262BExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page Ignition Module High Limit Manual ResetFlow Switch Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalUDB Diagnostic Board Pump Time DelayUDB Fault History Water Piping 87%-Efficiency Boilers Special InstructionsVenting Appliance Categories Vent Terminal Location Vertical Venting CategoryCondensate Management Certified Maximum Combustion Air Air Inlet Model Venting Combustion 40’ 75’ 2072BE Air 2342BEDirect Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram-Models 992B-1262B Wiring Diagram-Models 1532B-2342B START-UP Pre Start-upMain Burner Adjustment Blower AdjustmentStart-Up Follow-Up Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Pilot Turn-Down TestPost Start-Up Check Leak TestLighting Instructions OperationTo Turn Off Gas To Appliance Troubleshooting StepSuggested Minimum Maintenance Schedule MaintenancePreventive Maintenance Schedule Annually WeeklySemi-Annually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page Page Page

992B specifications

The Raypak 992B is a highly regarded commercial boiler known for its efficiency and reliability in heating applications. Designed for a range of installations, it is particularly favored in schools, hotels, and various commercial settings where dependable heating is crucial. One of the standout features of the Raypak 992B is its impressive thermal efficiency rating, often exceeding 90%. This efficiency translates into lower energy costs and reduced environmental impact, making it a smart choice for eco-conscious businesses.

The Raypak 992B comes equipped with advanced technologies that enhance performance and ease of use. Among these technologies is the high-precision digital control system, which allows for accurate temperature regulation and monitoring. This feature ensures optimal performance and minimizes energy waste, further contributing to the unit's cost-effectiveness. The boiler also utilizes a modulating burner system, enabling it to adjust flame size based on real-time heating demands. This adaptability not only enhances efficiency but also improves overall comfort within a facility.

Another significant characteristic of the Raypak 992B is its robust construction. Built with durable materials designed to withstand demanding operating conditions, this boiler is engineered for long-lasting performance. Its compact design is an added benefit, facilitating installation in areas with limited space. The unit is also equipped with a stainless steel heat exchanger, which provides superior resistance to corrosion and enhances heat transfer efficiency.

Safety features are also paramount in the design of the Raypak 992B. The boiler includes multiple safety controls and alarms to prevent overheating and maintain safe operating conditions. This diligence in safety ensures peace of mind for operators and reduces the risk of unexpected downtime.

In summary, the Raypak 992B stands out as a top choice for commercial heating solutions, combining high efficiency, advanced technology, and rugged construction. Its features cater to a wide range of heating needs while prioritizing safety and economy. With its impressive performance capabilities, the Raypak 992B continues to be a reliable partner for facilities seeking optimal heating solutions.