speed. Do not operate summer exhaust fan. Close fireplace dampers.

4.Place in operation the appliances being inspected. Follow the manufacturer’s instructions for lighting each appliance. Adjust thermostat so appliance will operate continuously.

5.Check the pressure at a pressure tap located 12 in. above the bottom joint of the first vertical vent pipe. Pressure should be anywhere between -0.01 and -0.08 in. WC.

6.After it has been determined that each appliance remaining connected to the common venting sys- tem properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and other gas burning appliances to their previous conditions of use.

7.Any improper operation of the common venting system should be corrected so that the installation conforms with the NFGC (U.S.) or B149 (Canada). When re-sizing any portion of the common venting system, the common venting system should be re- sized to approach the minimum size as determined using the appropriate tables in the NFGC (U.S.) or B149 (Canada).

Horizontal Through-the-Wall Venting (Category III)

*

*Requires optional vent tee.

Fig. 28: Horizontal Through-the-Wall Venting

(Category III)

Installation

These installations utilize the heater-mounted blower to vent the combustion products to the outdoors. Combustion air is taken from inside the room and the vent is installed horizontally through the wall to the out- doors. Adequate combustion and ventilation air must be supplied to the equipment room in accordance with the NFGC (U.S.) or B149 (Canada).

The total length of the horizontal through-the-wall flue system should not exceed 70 equivalent ft in length. If horizontal run exceeds 70 equivalent ft, an appropri- ately sized extractor must be used. Each elbow used is equal to 10 ft of straight pipe. This will allow installa- tion in one of the four following arrangements:

70’ of straight flue pipe

60’ of straight flue pipe and one elbow

50’ of straight flue pipe and two elbows

40’ of straight pipe and three elbows

The vent cap is not considered in the overall length of the venting system.

The vent must be installed to prevent flue gas leakage. Care must be taken during assembly to ensure that all joints are sealed properly and are airtight. The vent must be installed to prevent the potential accumulation of condensate in the vent pipes. It is required that:

1.The vent must be installed with a slight downward slope of not more than 1/4 inch per foot of hori- zontal run to the vent terminal.

2.The vent must be insulated through the length of the horizontal run.

For installations in extremely cold climate, it is re- quired that:

1.The vent must be installed with a slight upward slope of not more than 1/4 inch per foot of hori- zontal run to the vent terminal. In this case, an approved condensate trap must be installed per applicable codes.

2.The vent must be insulated through the length of the horizontal run.

Termination

The flue direct vent cap MUST be mounted on the ex- terior of the building. The direct vent cap cannot be installed in a well or below grade. The direct vent cap must be installed at least 1 ft above ground level and above normal snow levels. The Raypak-approved stainless steel flue direct vent cap must be used (sales order option D-15).

WARNING: No substitutions of flue pipe or vent cap material are allowed. Such substitutions would jeopardize the safety and health of inhabitants.

30

Image 30
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Product Receipt Before InstallationInstallations at Elevation Model IdentificationComponent Locations Component Locations BackValves General InformationModel Quantity Vent Size Gas Burners Blowers Model Burners per Valve Stages Fire at StageGeneral Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Equipment Base InstallationInstallation Codes StackingTable D Vent/Air Inlet Termination Clearances Indoor Installations Outdoor InstallationsClearances Direct Vent Combustion and Ventilation AirReversing Air Filter Indoor UnitsTruSeal Combustion Air InstallationsConventional Combustion Air Supply All Air from Inside the BuildingGeneral Canadian InstallationsWater Piping Reversing Water ConnectionsRelief Valve Piping Hydrostatic Test Cold Water OperationTemperature & Pressure Gauge Hydronic HeatingPump Selection Air-Separation/Expansion Tank Pressure Drop in Feet of Head Feedwater RegulatorPiping Three-Way ValvesPotable Water and Space Heating Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterPH of Water Gas SupplyPool/Spa Water Chemistry Water Hardness Total Dissolved SolidsModel Gas Supply ConnectionReversing Gas Supply Connection Table I Maximum Equivalent Pipe LengthGas Supply Pressure Electrical Power ConnectionsCheck the Power Source Field-Connected ControllersField Wiring Connection Making the Electrical ConnectionsOn-Off Wiring Connections Model Diameter Order Number VentingFlue Exhaust Tee Appliance CategoriesCombustion Exhaust Support of Vent StackVent Terminal Location Certified Combustion AirInstallations Canadian InstallationsChanging the Flue Outlet Installation Venting Installation TipsVenting Configurations Natural Draft Vertical Venting CategoryCertified Vertical Venting Combustion Air Air Inlet Model TerminationCommon Venting System HeightHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryVenting Direct Vent Horizontal Through- the-WallModel Certified Maximum Combustion Air Inlet EquivalentDirect Vent Vertical Direct Vent VerticalOutdoor Installation ControlsFreeze Protection Heater Sequence of Operation Models 992B-1262BExternal Lights Color Indication Models 1532B 1802B Page Page Models 2002B 2342B Page Page Ignition Module High Limit Manual ResetFlow Switch Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalPump Time Delay UDB Diagnostic BoardUDB Fault History 87%-Efficiency Boilers Special Instructions Water PipingVenting Appliance Categories Vertical Venting Category Vent Terminal LocationCondensate Management Certified Maximum Combustion Air Air Inlet Model Venting Combustion 40’ 75’ 2072BE Air 2342BEDirect Vent Horizontal Through- the-Wall 992BE 75’ 100’ 1262BE Galvanized Steel 1532BE Category 25’ Wiring Diagram-Models 992B-1262B Wiring Diagram-Models 1532B-2342B START-UP Pre Start-upBlower Adjustment Main Burner AdjustmentStart-Up Follow-Up Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Pilot Turn-Down TestPost Start-Up Check Leak TestOperation Lighting InstructionsTo Turn Off Gas To Appliance Troubleshooting StepMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule Annually WeeklySemi-Annually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty HI Delta Types H and WH Limited Parts Warranty HI Delta Type P START-UP Checklist for FAN-ASSISTED Raypak Products Page Page Page

992B specifications

The Raypak 992B is a highly regarded commercial boiler known for its efficiency and reliability in heating applications. Designed for a range of installations, it is particularly favored in schools, hotels, and various commercial settings where dependable heating is crucial. One of the standout features of the Raypak 992B is its impressive thermal efficiency rating, often exceeding 90%. This efficiency translates into lower energy costs and reduced environmental impact, making it a smart choice for eco-conscious businesses.

The Raypak 992B comes equipped with advanced technologies that enhance performance and ease of use. Among these technologies is the high-precision digital control system, which allows for accurate temperature regulation and monitoring. This feature ensures optimal performance and minimizes energy waste, further contributing to the unit's cost-effectiveness. The boiler also utilizes a modulating burner system, enabling it to adjust flame size based on real-time heating demands. This adaptability not only enhances efficiency but also improves overall comfort within a facility.

Another significant characteristic of the Raypak 992B is its robust construction. Built with durable materials designed to withstand demanding operating conditions, this boiler is engineered for long-lasting performance. Its compact design is an added benefit, facilitating installation in areas with limited space. The unit is also equipped with a stainless steel heat exchanger, which provides superior resistance to corrosion and enhances heat transfer efficiency.

Safety features are also paramount in the design of the Raypak 992B. The boiler includes multiple safety controls and alarms to prevent overheating and maintain safe operating conditions. This diligence in safety ensures peace of mind for operators and reduces the risk of unexpected downtime.

In summary, the Raypak 992B stands out as a top choice for commercial heating solutions, combining high efficiency, advanced technology, and rugged construction. Its features cater to a wide range of heating needs while prioritizing safety and economy. With its impressive performance capabilities, the Raypak 992B continues to be a reliable partner for facilities seeking optimal heating solutions.