Raypak B6000 manual Table of Contents

Page 4

TABLE OF CONTENTS

 

PAGE

Contents

3

Getting Started

5

Foreword

5

Installation and Mounting

7

Mechanical Installation

7

Electrical Installation

8

Check Your Power Source

8

Air Temperature Sensor

9

Water Temperature Sensor

10

Important Configuration Note

12

Wiring - Air and Water Sensors

12

Communication (RS485) Wiring

13

Wiring: Power Source to Control and Boiler Modules

14

Power Test

15

Boiler Monitor Select Switch

16

Boiler Monitor Communications Jumper W1

17

Optional Boiler Monitor Control

18

Field Wiring - Single Boiler

18

Field Wiring - Multiple Boilers

19

Installation Verification Procedure

20

System Control/Display Familiarization

21

Power Up - Boiler Monitor

22

Power Up - System Control Module

23

Displays

23

Important (Start Alternate)

35

System Control Box

39

System Control Board Pictorial

40

Replacement Parts List

42

Boiler Monitor Control Box

44

System Settings

46

Troubleshooting Guide

47

Page 4

Image 4
Contents B6000TM System Controlboiler MonitorPage Contents Equipment Quantity B6000 Boiler Management System BMSTable of Contents Foreword System Control Module hasEach Boiler Monitor Module contains Installation and Mounting Mechanical InstallationCheck Your Power Source Install Conduit AS Appropriate Dimensions and WeightElectrical Characteristics Electrical Installation VAC Feeder CircuitsAIR Temperature Sensor InstallationWater Temperature Sensor Installation Notes Water Temperature SensorTypical Water Sensor Simplified Diagram of Typical Piping Wiring AIR and Water Sensors To the System Control ModuleCommunication RS 485 Wiring Belden #9842Wiring Power Source to System Control and Boiler Mod- ules Power Test Switch Boiler Monitor Select SwitchBoiler Monitor Card Pictorial Boiler Monitor Communications Jumper W1 Optional Boiler Monitor Field Wiring Multiple Boilers Installation Verification Procedure Mechanical InstallationAIR Temperature Sensor Water Temperature SensorEditing B6000 Displays Location System CONTROL/DISPLAY FamiliarizationSelectable Parameters Range Value Boiler Monitor POWER-UPSystem Control Module System Temperatures Indicates selectable item DisplaysInformation only Boiler Valve Firing RatesBoiler Status ReadoutHigh Limit No PilotLwco Lead LAG, Night SET Back Primary Control ParametersTemperature F Push SelectSet = 135F Ratio Outdoor System 140 150 160 Suggested GuidelinesSecondary Control Parameters Step Lead Boiler SelectPush Select Pump Delay Automatic Lead LagStandard Boiler Parameters Boiler ParametersSetback Times Am or pm Setback OFF DAY Boiler Valve Timing Information onlyALL Boilers ON/OFF Target MIN/MAX and HI LIMStandard Utility Service Utility ServiceTandard Initialize InitializeWiring AIR and Water Sensors Start AlternateAlternate Communication RS 485 Wiring Page Alternate Power Test Check Power Fig. # Fig. # System Control Board New CP10.0 90FI Replacement Parts List Boiler Monitor Control BOX Spdt Call OUT SystemDpdt Temperature Scale F or C Standard Select Set OptionalUniversal Select Set OptionTroubleshooting Guide Trouble Shooting Guide Limited Warranty Design and specifications subject to change without notice
Related manuals
Manual 24 pages 53.62 Kb

B6000 specifications

The Raypak B6000 is a high-efficiency boiler designed for residential and commercial heating applications. Known for its reliability and advanced features, the B6000 exemplifies Raypak's commitment to engineering excellence and innovative technology.

One of the standout attributes of the Raypak B6000 is its robust construction. The boiler is built with high-quality materials, ensuring durability and longevity in a variety of environments. It features a compact design, which allows for easy installation even in spaces with limited room. Moreover, it has a user-friendly interface that facilitates straightforward operation and maintenance, making it accessible for both homeowners and HVAC professionals.

The B6000 is equipped with advanced heating technologies that enhance its performance and efficiency. It utilizes a modulating burner system that adjusts the heat output based on the demand, ensuring optimal energy usage. This not only leads to lower energy bills but also contributes to a reduced carbon footprint, making the B6000 an environmentally friendly choice.

Another key feature of the Raypak B6000 is its stainless steel heat exchanger, which provides superior heat transfer and contributes to the boiler's overall efficiency. The heat exchanger is designed to withstand high temperatures and pressures, ensuring safety and reliability throughout its operation. Additionally, the B6000 offers multiple venting options, including direct venting and horizontal venting, providing flexibility in installation.

The B6000 also comes with integrated controls that allow users to easily monitor and adjust settings. These controls can enhance energy efficiency by accommodating varying heating needs throughout the day. Furthermore, the boiler is compatible with smart home systems, enabling remote operation and monitoring.

In terms of safety features, the Raypak B6000 is equipped with multiple safety sensors and shutoff systems to ensure safe operation. This includes automatic shutdown in case of malfunction, preventing potential hazards.

Overall, the Raypak B6000 is a top-tier boiler that combines efficiency, reliability, and advanced technology, making it a preferred choice for those seeking a dependable heating solution. It is suitable for various applications, from residential heating to larger commercial projects, further establishing its versatility in the market. Whether for new installations or replacements, the B6000 stands out as a reliable option for efficient heating solutions.