Samsung APC3240C, UPC3240C installation manual English

Page 29

3.Install the high pressure pipe to the heat exchanger liquid pipe, and the low pressure pipe to the

heat exchanger gas pipe respectively using the flare nut, taking care not to cause any leakage of refrigerant.

4.Be sure to insulate the pipe with appropriate insulation material.

5.Insert the drain hose into the drain pipe, and connect them by tying them to the cable tie to prevent any water leakage.

6.After completion of the installation, check the connecting area for any gas leakage.

7.Wind a finish tape when the wiring of the refrigerant pipe, the unit, and the drain piping are completed.

Outdoor unit

checking area

Indoor unit checking area

ENGLISH

E-29

Image 29
Contents Climatiseur Monobloc DE Type Split Refroidissement APC3240C UPC3240C Split Type Packaged AIR Conditioner CoolSafety Precautions Contents Indoor Unit View of the UnitOutdoor Unit Remote Control Buttons and Display Getting Started Using the Remote Control Inserting the Remote Control BatteriesUsing the Control Panel on the Indoor Unit Selecting the Automatic Operating Mode Cooling Your Room Removing Excess Humidity Changing the Room Temperature Quickly Selecting the Long Function Airing Your Room Adjusting the Air Flow Direction Horizontally Adjusting the Air Flow Direction VerticallyTo Cancel the On Timer Setting the On TimerTo Cancel the Off Timer Setting the Off TimerTo Cancel the Sleep Timer Setting the Sleep TimerTopic Recommendation Operating RecommendationsIf the air conditioner is used at... Then Temperature and Humidity RangesCleaning Your Air Conditioner AUTO, Cool Solving Common ProblemsModel Technical SpecificationsInstallation Manual Absolute Checkpoints Outdoor Unit Indoor UnitElectrical Work Installation Procedures Installation MethodEnglish Flare Processing Connection of Refrigerant PipingDrain Hose Connecting the pipeDrilling a Hole in the Wall AIR Purge Refrigerant Charging Check Check and Test OperationTest Operation Electronics