REFRIGERANT CHARGING
Air purge(at the time of new installation only)
Close the gas pipe side valve by turning it clockwise.
Connect the pressure gauge to the low pressure side service valve, and then open the gas pipe side valve again.
Connect it to the refrigerant filling tank.
(Turn the tank upside down : Fill the refrigerant in liquid form.)
Start cooling operation.
Check the pressure of the pressure gauge. Check whether the low pressure side is within the range of 4.5~5.5kg/cm2G
(outside temperature 95°F/35°C).
Open the tank and refill the refrigerant until arriving at the proper pressure.
(Refill the refrigerant slowly checking the pressure.)
Stop operation.
Close the gas pipe side valve, and loosen the pressure gauge connected.
Then open the gas pipe side valve again.
Tighten the cap of each valve using a specified tool.
OUTDOOR UNIT
Gas pipe side
Liquid pipe side