APC AR4038A Vertical Mounting Flanges, Adjusting the vertical mounting flanges on the side braces

Page 15

Vertical Mounting Flanges

Vertical mounting flanges come factory-installed on the enclosure in the proper position for use with rack-mountable equipment having a depth of 800 mm (31.5 in). The front mounting flanges are adjustable towards the rear of the enclosure to accommodate different rails or equipment with other depths.The rear mounting flanges are adjustable towards the front. The flanges can be adjusted to be as close as 120 mm (4.7 in) or as far as 880 mm (34.6 in) apart in 40 mm (1.5 in) increments.

Note: If the front accessory channel is removed from the enclosure, the front rails can be adjusted forward 8 cm (3.14 in).

A common application for the enclosure is to move the flanges to a depth of 476 mm (18.75 in) to accommodate networking and telecommunications equipment.

Adjusting the vertical mounting flanges on the side braces

Perform this procedure without any equipment installed on the mounting flanges.

1. Use a Phillips screwdriver (not provided) to remove the screws in the vertical mounting flange.

2.Move the pre-installed caged nut to the desired location, then reposition the vertical mounting flange to this position and install the screws.

ns1551a

ns1552a

ns1553a

NetShelter CX Enclosure: Installation and Customization

11

Image 15
Contents Installation and Customization Page Contents Specifications General Information Important Safety InformationDisclaimer About This ManualRelated Documents User Comments Product Overview DescriptionNetShelter CX Enclosures Enclosure components Product InventorySafety Important InformationTools Configuration Front doors and Side PanelsBlanking panels Removal Rack stabilization options InstallationInstallation and Setup Leveling the enclosure and installing bottom trimRemoving the fan module Removing and Installing Fan ModulesUnlock the fan module Lock the fan moduleAP9568 International SpecificationsRack PDU AP9567 North AmericanVertical Mounting Flanges Adjusting the vertical mounting flanges on the side bracesRemoving cage nuts Installing EquipmentInstalling cage nuts Identifying one U-space on the vertical mounting flangeEquipment Planning Guidelines Enclosure dimensions internal DimensionsRear cable access port Vertical 0U accessory channelsCable Management SKU Cable management options for 600-mm and 750-mm enclosuresNs1156a AR8105BLK Cooling Enclosure placement750-mm, 18, 24, 38-U Enclosures SpecificationsTwo-Year Factory Warranty Terms of warrantyNon-transferable warranty Exclusions Warranty claims Page 990-3594A-001 08/2012 APC Worldwide Customer Support