APC NS1435A manual Installing Equipment, Identifying one U-space on the vertical mounting flange

Page 16

Installing Equipment

This section provides information on how to install rack-mount equipment in the enclosure. The instructions provided with the equipment provide more detailed information.

Identifying one U-space on the vertical mounting flange

When installing equipment, locate the top and bottom of a U-space on the mounting flanges. Every third hole on the mounting flanges of a NetShelter enclosure is numbered to indicate the middle of a U-space. A U-space consists of one of these numbered holes and one hole directly above and below it, as shown.

7

1 U 6

5

ns0014a

Installing cage nuts

APC offers a cage nut hardware kit (AR8100) for use with square holes. Install cage nuts horizontally, with the ears engaging the sides of the square hole. Do NOT install cage nuts vertically with the ears engaging the top and bottom of the square hole.

1.Insert the cage nut into the square hole by hooking one ear of the cage nut assembly through the far side of the hole.

Note: Install the cage nuts on the interior of the vertical mounting flange.

2.Place the cage nut tool (not provided) on the other

side of the cage nut and pull to snap it into position.

Removing cage nuts

1. Remove any attached screw.

2. Grasp the cage nut and squeeze the sides to release it from the square hole.

12

NetShelter CX Enclosure: Installation and Customization

Image 16
Contents Installation and Customization Page Contents Specifications Important Safety Information General InformationAbout This Manual DisclaimerRelated Documents User Comments Description Product OverviewNetShelter CX Enclosures Product Inventory Enclosure componentsImportant Information SafetyTools Front doors and Side Panels ConfigurationBlanking panels Removal Installation Installation and SetupLeveling the enclosure and installing bottom trim Rack stabilization optionsRemoving and Installing Fan Modules Unlock the fan moduleLock the fan module Removing the fan moduleSpecifications Rack PDUAP9567 North American AP9568 InternationalAdjusting the vertical mounting flanges on the side braces Vertical Mounting FlangesInstalling Equipment Installing cage nutsIdentifying one U-space on the vertical mounting flange Removing cage nutsEquipment Planning Guidelines Dimensions Enclosure dimensions internalVertical 0U accessory channels Rear cable access portCable Management Cable management options for 600-mm and 750-mm enclosures SKUNs1156a AR8105BLK Enclosure placement CoolingSpecifications 750-mm, 18, 24, 38-U EnclosuresTerms of warranty Two-Year Factory WarrantyNon-transferable warranty Exclusions Warranty claims Page APC Worldwide Customer Support 990-3594A-001 08/2012