Nova 50-0-1818-34, 50-0-1818-24, 50-0-1818-33, 50-0-1818-30, 50-0-1818-27 manual Hardware Packing List

Page 2

HARDWARE

15

14

8

PACKING LIST

Ref. #

Item #

Qty.

Description

1

20060126

1

Keyboard hanger with glide

 

 

 

– Left

2

20060105

2

Side Assembly

3

20060101

2

Cross Brace

4

20060127

1

Keyboard hanger with glide

 

 

 

– Right

5

Varies with Retrofit

1

Keyboard Drawer

6

10060127

1

Monitor Support

7

5081070

1

Viewport Glass

11

4

12

17

16

9

10

Step 3

Review and identify Retrofit Kit parts listed above.

8

50900258

4

Leveler

9

1412APPBO

18

Screw - #14x3/4"

10

50900032

6

Screw - #14x1-1/2"

11

TB-M

4

Tracking Block

 

TB-F

4

Tracking Block

12

6N50TXPZ

8

Screw - Security, #6x5/8"

13

5011818

2

Leg

14

50900034

4

Trim Ring Corner

15

50900035

4

Trim Ring Straight - B

16

5081060

1

Visor

17

FR2020/Clip

2

Locking Tab

 

OPTIONS

 

 

 

5081120

1

Power Strip

 

5081066

1

CPU Holder

 

5081018

1

Anti-Reflective Glass

Step 4

Attach Cross Braces (Ref. #3) to Side Assemblies (Ref. #2) using eight (8) Screws (Ref. #9). See Figure 2.

FIGURE 2

13

8

 

 

 

 

10

 

 

 

8

 

 

9

13

8

 

 

 

10

9

2

3

8

 

 

 

 

 

 

 

 

9

 

3

2

 

 

9

 

 

Step 5

If you are not using optional floor support legs (Ref. #13), skip to Step #7. Otherwise, attach Leg (Ref. #13) to Side Assembly (Ref. #2) using two (2) Screws (Ref. #10). Repeat procedure for other side. Insert Levelers (Ref. #8) into bottom of Leg (Ref. #13). Repeat procedure for other side. See Figure 2.

Step 6

Turn Retrofit Assembly upright. Slide under viewport cutout in worksurface. Align holes in top rails of Side Assemblies (Ref. #2) with holes in worksurface. Attach Retrofit Assembly to the worksurface securely using six (6) Screws (Ref. #9). Optional: Adjust Levelers (Ref. #8).

Page 2

50-0-1818 Asy. Instr., © Nova Solutions, Inc. 2002

Image 2
Contents 50-0-1818 Hardware Packing List Exploded View Monitor Adjustment