Hunter Fan 42405-01 Installer’s Choice and Optional Accessories, Standard Mounting hangs from

Page 3

Installer’s Choice and Optional Accessories

Understanding Mounting and Installer’s Choice®

Hunter’s patented 3-position mounting system provides you maximum installation flexibility and ease. You can install your Hunter fan in one of three ways, depending on ceiling height and your preference: Low Profile, Standard, or Angle mounting. e steps in this manual include instructions for all three Installer’s Choice mounting methods.

Considering Optional Accessories

Low Profile Mounting fits close to the ceiling, recommended for ceilings less than 8 feet high

Consider using Hunter’s optional accessories, including a wall-mounted or remote speed control. To install and use the accessories, follow

the instructions included with each product. For quiet and optimum performance of your Hunter fan, use only Hunter speed controls.

For ceilings higher than 8 feet, you can purchase Hunter extension downrods. All Hunter fans use sturdy 3/4” diameter pipe to assure stability and wobble-free performance.

Standard Mounting hangs from

 

the ceiling by a downrod (included),

3

recommended for ceilings 8 feet or higher

Angle Mounting recommended for a vaulted or angled ceiling

42405-01 • 01/20/06

Hunter Fan Company

Image 3
Contents For Your Records and Warranty Assistance Table of Contents WelcomeHunter Fan Company Installer’s Choice and Optional Accessories Standard Mounting hangs fromAngle Mounting recommended for a vaulted or angled ceiling Getting Ready Installing Multiple Fans?Step Steps 2-3 Installing the Ceiling PlateSteps 3-2 Assembling and Hanging the FanFor Standard or Angled Mounting For Low Profile MountingSingle Switch Wiring Wiring the FanStep Installing the CanopyAssembling the Blades DetailSteps 6-1 Steps 7-5 Steps 7-1Operating and Cleaning Your Ceiling Fan To Change Airflow DirectionCold weather , use upward Problem Excessive wobbling TroubleshootingProblem Nothing happens fan does not move Problem Noisy operation