EdgeStar AP410W manual Lcdi plug wring instruction, Plug Testing Instructions

Page 22

LCDI plug wring instruction :

This unit is provided with Leakage Current detection interruption circuit (LCDI )built into the plug of the power supply cord . This device provides protection to reduce the risk of fire due to arcing faults in the power–supply cord. Before use, follow the “Plug Testing Instructions” to ensure that the LCDI circuit is functioning properly:

Plug Testing Instructions:

1.Press Test Button. Unit should trip.

2.Press Reset Button firmly

DO NOT USE IF THE ABOVE TEST FAILS

Do not use the TEST and RESET buttons as an on/off switch. They are only meant to be used to periodically check the LCDI plug

CALL CUSTOMER SERVICE IF TEST FALLS

22

Image 22
Contents Page Table of contents Thank you Energy saving tips Safety precautions SpecificationsPage Front view PartsRear view Accessories Installation Installing the exhaust hoseWindow installation Wall installation permanent mounting Page LED indicators Control panelSetting up the remote control Remote ControlButtons Remote control functions Page Regulating airflow direction Drain parts Manual drainageDraining with the drain tray Cleaning the condenser coils MaintenanceCleaning the exterior Prefilter and charcoal filterCleaning the prefilter Installing the charcoal filterLong term storage Troubleshooting Problem Possible Causes SolutionsPage Plug Testing Instructions Lcdi plug wring instructionLimited warranty What is Covered