Bakers Pride Oven CPH70-MP17 operating instructions Wiring Diagram, Sjo

Page 13

WIRING DIAGRAM

 

CPH70-MP17

CLASSIC-LINE PROOFER HEATER - 220-240V, 50Hz, 1Ph

220-240V, 50Hz, 1 Ph

 

 

 

 

 

 

 

 

 

 

 

Power Cord

 

 

 

 

 

 

 

 

 

 

 

A

A

A

N

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

Heater

 

6

 

 

 

 

 

11

 

12

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

Fan

5

1.

Proofing Thermostat

 

 

 

 

Thermometer

 

 

2.

On/Off Switch

 

8

 

10

 

 

 

 

 

 

 

9

 

 

 

 

 

3.

Mechanical Timer

 

 

 

 

 

 

 

 

 

 

4.

Terminal Block

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.

Fan Motor

 

 

13

 

 

11

10

 

 

 

 

 

6.

Heating Element

 

 

 

 

Temp. Probe

 

 

 

7.

Selector Switch DP

 

 

 

 

 

 

 

 

 

 

 

8.

Heating Thermostat

 

 

 

 

 

 

 

 

 

 

 

9.

Digital Thermometer

 

 

 

 

 

 

 

 

 

 

 

A

Supply Cord - 3 Conductor,

 

 

 

 

 

 

 

 

 

 

 

12 A.W.G.,

Type

SJO,

 

 

 

 

 

 

Timer

3

 

 

 

Rated 105°C.

 

 

 

 

Proof

7

 

 

*

All Other Wire Is 12 A.W.G.,

 

 

 

 

 

4

4

5

 

 

 

Stranded,

Nickel

Clad

 

 

 

 

 

 

 

 

Copper, 36 MILS Insulation

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rated 200°C.

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

Proof T-Stat

1

 

 

 

 

 

 

 

 

5

 

 

Heat T-Stat

8

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

6

 

 

 

3

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

1

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat

 

 

 

 

 

 

 

 

 

Image 13
Contents CLASSIC-LINE Proofer Heater Table of Contents Delivery Review of Received Goods Delivery and Freight ClaimsFreight Claims Inspection Understand Signal Words Recognize Safety InformationPrepare for Emergencies Safety and Warning Labels Label Locations Follow Safety InstructionsElectrical Operating ProceduresLocation Typical Proofing Preparation To Oper TE AS a Heated Holding CabinetFreshly Prepared Dough Heater Assembly Removal Cleaning ProceduresLedge Removal AIR Tunnel Removal Drip Trough Draining and RemovalMoving Cabinet Exterior CleaningProblem Probable Cause Solution TroubleshootingGreen SJO Wiring DiagramDomestic Warranties and Service International Warranties and Service BevLes