TABLE OF CONTENTS |
|
|
|
SECTION | PAGE |
|
|
DELIVERY & FREIGHT CLAIMS | 3 |
DELIVERY | 3 |
Review of Received Goods | 3 |
FREIGHT CLAIMS | 3 |
Inspection | 3 |
INTRODUCTION | 3 |
WARNING LABELS AND SAFETY INSTRUCTIONS | 4 |
Recognize Safety Information | 4 |
Understand Signal Words | 4 |
Avoid Injury | 4 |
Emergency Preparation | 4 |
Follow Safety Instructions | 5 |
Safety & Warning Labels | 5 |
Label Locations | 5 |
ELECTRICAL | 6 |
Electrical Rating | 6 |
Electrical Connection | 6 |
LOCATION | 6 |
OPERATING PROCEDURES | 6 |
Control Panel Configuration | 6 |
To Operate as a Heated (Holding) Cabinet | 7 |
To Operate as a Proofing Cabinet | 7 |
Heat and Moisture (Secondary Control) | 8 |
CLEANING PROCEDURES | 8 |
Ledge Removal | 8 |
Holding or Proofing Assembly Removal | 8 |
Drip Trough Draining and Removal | 9 |
Air Tunnel Removal | 9 |
Exterior Cleaning | 10 |
Interior Cleaning | 10 |
Moving Cabinet | 10 |
TROUBLESHOOTING | 11 |
WIRING DIAGRAMS | 12 |
120V, 60Hz, 1 Ph | 12 |
13 | |
WARRANTY | 14 |
Domestic Warranty | 14 |
International Warranty | 15 |
2