Desa VF-24P-PJD,VF-24N-PJD, VF-18N-PJD, VF-18P-PJD Operating Heater, Continued, Set Timer

Page 17
Set Timer

OPERATING HEATER

Continued

Set Timer

Switch to timer mode by pressing the SET button briefly.

Press the SET button until P1•Press the SET button until P1 flashes. flashes.

Set the hours with •Press SET briefly for the next burner cycle time. and minutes with Shutting Off Heater .

Press SET briefly for the next burner cycle time.

If all 4 times are set, pressing the OFF button or waiting will complete the programming.

TO TURN GAS OFF

TO APPLIANCE

Shutting Off Heater

Press OFF button on remote control to switch off main gas and pilot gas.

Shutting Off Burner Only (pilot stays lit) Press to decrease the flame height and shut off main burner.

MANUAL LIGHTING

PROCEDURE

Lighting with a Match WARNING: Manual lighting must be performed by a qualified service person.

The system has a "MANUAL OVERRIDE" feature that allows you to light with a match.

Lighting with a Match

1.STOP! Read the safety information on page 14.

2.Make sure equipment shutoff valve is fully open.

3.Turn motor-knob clockwise to 1.STOP! Read the safety information on page 14. to OFF position.

4.Wait (5) minutes to clear any gas and then smell for gas around heater and near floor. If you smell gas, STOP! follow "B" on page 14. If you do not smell gas, go to the next step.

5.Make sure ON/OFF switch is in "–" (ON) position.

6.MAN-knob (valve) in MAN position, a metallic core is visible. (see Figure 17).

7.Push and hold down metal core fully by us- ing a non-sharp object such as a pen. This lets the pilot gas flow.

8.Light pilot burner with a match, (see Figure 18).

9.Continue holding down metal core for about 10 seconds. Pilot should stay lit after releas- ing metal core. If not, repeat step 1 thru 4.

10.Turn MAN-knob to ON position. This lets main gas flow.

11.Turn Motor-knob to adjust flame. Knob has a slipping clutch that allows manual flame height adjustment as well as adjustment to pilot gas.

Lighting with Piezo Ignitor

1.Disconnect ignitor cable from receiver and connect to Piezo Ignitor Tab (see Figure 17 and Wiring Diagram on page 24).

2.STOP! Read safety information on page 14,
3.Make sure equipment shutoff valve is fully open.
4.Turn Motor-knob clockwise 3.Turn motor-knob clockwise to  to OFF position. to the OFF position.

5.Wait (5) minutes to clear any gas and then smell for gas around heater and near floor. If you smell gas, STOP! follow "B" on page 14.

6.ON/OFF switch in "—" ON position.

7.MAN-knob on valve is in MAN position (see Figure 17), When in MAN position you can see a metallic core.

8.Push and hold down metal core fully with a pen while the pilot gas flows.

9.Press and release piezo ignitor button until pilot lights.

Piezo

Metalic

MAN-Knob

Motor-

Core for

Knob

Ignitor

Manual

in Manual

in ON

Tab

Ignition

Position

Position

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Piezo Ignitor 8.Light pilot burner with a match, (see Figure 18). Microswitch

ON/OFF Switch

Figure 17 - PJD Control Valve

Figure 18 - Pilot

111826-04A

www.desatech.com

17

Image 17
Contents WHAT TO DO IF YOU SMELL GAS TABLE OF CONTENTS SAFETY INFORMATION PRODUCT IDENTIFICATION SAFETY INFORMATIONContinued Figure 1 - Product IdentificationSAFETY PILOT PRODUCT FEATURESLOCAL CODES UNPACKINGContinued AIR FOR COMBUSTION AND VENTILATIONDETERMINING FRESH-AIRFLOW FOR HEATER LOCATION Confined and Unconfined SpaceContinued AIR FOR COMBUSTION AND VENTILATIONVentilation Air From Inside Building Ventilation Air From OutdoorsWARNING Never install the heater INSTALLATIONin a bedroom or bathroom in a recreational vehicleIf Not Using Mantel INSTALLATIONIf Using Mantel ContinuedSafe Installation INSTALLATIONContinued Materialoperate the logs only with the flue damper open INSTALLATIONraise the mantel to an accept- able height remove the mantelCONNECTING TO GAS SUPPLY INSTALLATIONPRESSURE TESTING GAS SUPPLY PIPING SYSTEM INSTALLATIONCHECKING GAS CONNECTIONS Natural GasPRESSURE TESTING HEATER GAS CONNECTIONS INSTALLATIONOPERATING HEATER ContinuedREMOTE LIGHTING INSTRUCTIONS OPERATING HEATERContinued Setting The Display C/24h and F /12h Shut-offProcedureSetting The Time Battery Replacement1.STOP! Read the safety information on page Set Timer5.Make sure ON/OFF switch is in -ON position 2.STOP! Read safety information on pagesee Troubleshooting, page see Troubleshooting, pageOPERATING HEATER INSPECTING BURNERSCLEANING AND MAINTENANCE OBSERVED PROBLEM TROUBLESHOOTINGPOSSIBLE CAUSE REMEDYsee Cleaning and Mainte TROUBLESHOOTINGContinued Burner backfiring during comWARNING If you smell gas Shut off gas supply TROUBLESHOOTINGWIRING DIAGRAM TROUBLESHOOTINGIDENTIFYING ERROR SIGNALS FROM RECIEVER OBSERVED PROBLEMTECHNICAL SERVICE SERVICE HINTSREPLACEMENT PARTS PARTS UNDER WARRANTYACCESSORIES SPECIFICATIONSVF-18N-PJD VF-24N-PJDMODELS VF-18N-PJDAND VF-18P-PJD ILLUSTRATED PARTS BREAKDOWNPARTS LIST MODELS VF-24N-PJDAND VF-24P-PJD ILLUSTRATED PARTS BREAKDOWNChassis PARTS LIST111826-04A 111826-04A LIMITED WARRANTY VENT-FREEGAS LOG HEATERS WARRANTY INFORMATIONKEEP THIS WARRANTY