COMPLETING THE INSTALLATION
Fixing the Outdoor Unit in Position
456.5 mm |
254mm |
Rubber leg |
The outdoor unit must be installed on a rigid and stable base to avoid any increase in the noise level and vibration, particularly if the outdoor unit is to be installed close to a neighbour.
If it is to be installed in a location exposed to strong winds or at a height, the unit must be fixed to an appropriate support (wall or ground).
1Position the outdoor unit so that the air flow is directed towards the outside, as indicated by the arrows on the top of the unit.
2Attach the outdoor unit to the appropriate support using anchor bolts.
3If the outdoor unit is exposed to strong winds, install shield plates around the outdoor unit, so that the fan can operate correctly.
Certainly fix up its rubber leg, in order to prevent its vibration and noise.
Checking and Testing Operations
To complete the installation, perform the following checks and tests to ensure that the air conditioner is operating correctly.
1 | Review all the following elements in the installation: | ||||
| Installation site strength |
| |||
| Piping connection tightness to detect any gas leakages | ||||
| Connection wiring |
|
| ||
| |||||
| Drainage |
|
| ||
| Earthing wire connection |
| |||
| Correct operations (follow the steps below) | ||||
|
|
|
|
|
|
2 | Press the |
| button. |
|
|
|
|
| |||
| Result: |
| The indicator lights on the indoor unit flash at | ||
|
|
| intervals. |
| |
|
|
| While the indoor unit opens, the indoor unit fan runs to start. | ||
|
|
|
|
|
|
3 | Press the |
| button. |
|
|
| Result: | The outdoor unit operates in cooling mode as following | |||
|
| the room temperature. |
| ||
|
|
|
|
| |
4 | Air flow direction | Press the | button and check that the air flow | ||
|
|
|
| blades work properly. | |
|
|
|
|
|
|