Waterpik Technologies pool/spa heater warranty Typical Water Piping

Page 14

Page 12

26.Route the wires that attach to the temperature sensor along the copper siphon loop, back to the right side of the heater. Reconnect the wires to the tabs on the back of the control panel (marked as J4-1 and J4-2).

27.Use plastic wire ties to refasten the temperature sensor and high limit switch wires to the copper siphon loop. Bundle the wires near the control panel and fasten them with a wire tie.

28.Replace the flue collector so that the blower mount is in the same position as it was before the heat exchanger reversal. Be sure that the bottom of the flue collector lies flat on the top of the combustion chamber and that it covers all of the heat exchanger tubes. Replace the hex head screws to fasten the flue collector to the combustion chamber.

29.Reassemble the blower and exhaust vent to the flue collector. Be sure that the blower is seated properly on the gasket and fasten it to the flue collector with four hex head screws.

30.Reconnect the fan wires to the terminal strip as follows: (Terminal numbers are shown on wires connected to the bottom of the terminal strip)

a.Black Blower wire to terminal 11

b.Blue Blower wire to terminal 10

c.Red Blower wire to terminal 9

d.Yellow Blower wire to terminal 8

e.White Blower wire to terminal 7

31.Reconnect the two white wires to the vent switch now located just above the return header.

32.Reconnect the blower pressure switch tubing to the blower housing.

33.Replace the EMI shield (metal plate) located over the blower by reinstalling the two hex head screws.

34.Slide the upper right side panel back into the corner posts on the right side of the heater. Push it down until the tabs on the panel lock into the top of the corner posts.

36.Install the flat return header side cover plate (removed from the left side of the heater) on the right side to cover the return header by replacing the four philips head screws, one in each corner.

37.Slide the upper left side panel back into the corner posts on the left side of the heater. Push it down until the tabs on the panel lock into the top of the corner posts.

38.Remove the button plug from the inlet/outlet side cover plate.

39.Reinstall the inlet/outlet header side cover plate located under the inlet/outlet header. It is held with four philips head screws, one in each corner.

3-WAY

JANDY

CHANGEOVER

VALVE

3-WAY

JANDY

CHANGEOVER

VALVE

Figure 15. Typical Water Piping.

Image 14
Contents Installation LX and LT Gas-Fired Pool Table of Contents 2B. Heater Assembly and Preparation 1C. Warranty2A-1.Special Precautions LX and LT Pool Heaters2C-2. Installation Clearances 2C. Heater Location 2C-1. Installation Information2C-3. Flooring Typical Installation LX and LT Pool Heaters 2D. Outdoor Installation 2E. Outdoor Shelter Installation Canada2F-2. Special Location Requirement 2F-3. Air For Combustion and Ventilation2F-4b.Vent Pipe Sizing Installation 2G. Gas Supply and Piping 2G-1. General InstructionsHigh altitude H 2,000 to 4,500 feet 610 to 1370 m ` ` ` ` 2H-3. Auxiliary Time Clock Wiring 2G-2. Special Precautions for Propane Gas2H. Electrical Power 2H-1.General Information 2H-2. Bonding2H-4. Remote Operation Model LX Only Remove Jumper from Terminal Block2I. Water Piping 2I-1. Reversal of Heater Water Connections Water Connection as ShippedLX and LT Pool Heaters Typical Water Piping 2I-2. Pool/Spa Piping Systems Piping to Heater2I-3. Connections at Heater 2I-4. Pressure Relief Valve2J. Start-up and Adjustment 2J-1. Normal Operation 2I-5. Automatic Chlorinators Chemical Feeders2J-3. Gas Pressure 2J-4. Adjustment of Water Pressure Switch2J-2. Start-up 2J-5. Water Temperature Rise Adjustment of Pressure Switch3A. Start-Up Procedure Wire or remove the valve handle to prevent tampering3B. Temperature Controls 3B-1. Information Displayed3B-4. Error Status 3B-2. Turning the Heater On or OffLX/LT Heater Service Diagnostic Guide 3D. Water Chemistry 3C-2. Shutdown3C. Lighting and Shutdown 3C-1. Lighting the Heater 3D-1. PoolsFor Your Safety Read Before Operating 3D-2a. Spa Water Chemistry 3D-2d. Testing3E. Spa/Hot Tub Safety Rules 3D-2b. Water Changing3H. Periodic Inspection 3G. Seasonal Care 3G-1. Spring and Fall Operation3G-2. Winterizing 3H-1. Owner Inspection3H-2. Professional Inspection 4A. General Information 4A-1 Specifications4A-2 Dimensions 5A. General Information 5B. Part Numbers5C. Exploded View 5C-1 Overview LX and LT Pool Heaters 5C-2 Detail View Limited Warranty