Waterpik Technologies pool/spa heater warranty ` ` ` `

Page 9

LX and LT Pool Heaters

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

￿￿￿￿￿

Page 7

￿

￿

￿￿￿￿￿￿

 

 

 

 

 

 

 

 

Diagram

 

￿￿￿￿￿￿￿￿￿￿￿

￿￿￿￿

 

 

 

￿￿￿

￿￿￿

 

 

 

 

 

Wiring

 

￿

 

 

 

 

 

 

 

 

 

 

￿￿￿￿￿￿`￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿￿

 

 

 

1

￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

￿￿￿

￿￿

TEMP

SENSOR

2

 

 

 

 

 

 

￿

 

 

￿￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

￿

￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

￿￿

￿￿￿￿

￿￿￿￿￿

￿￿

￿

￿￿￿

￿￿￿￿￿￿

 

 

 

 

 

￿

￿

￿

￿￿

￿

￿

 

￿￿￿

 

 

 

 

` ` ` `

`

 

 

 

 

 

 

 

 

 

 

 

￿￿￿

 

32:(5

6285&(

 

 

 

 

 

 

 

 

￿￿

 

 

 

 

 

 

`+($7(5

 

 

 

￿

 

 

￿

￿￿￿￿￿

￿￿￿￿

 

￿

￿

 

 

 

￿

 

 

￿

 

￿￿

 

of a filter pump relay or time clock. has been shut off.

 

 

 

 

 

 

 

 

 

￿

 

 

￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

￿

 

 

 

 

 

 

output side

filter pump

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

"load" or

after the

 

 

￿

 

 

￿

 

 

 

 

 

￿￿￿

￿￿

￿￿￿￿￿

 

￿

￿

 

 

 

 

 

 

￿

 

 

 

￿

￿

￿

 

￿￿

 

 

 

connect the power of the heater to the

on this heater must have power to run

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

not fan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAUTION: Do The

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 8. LLD Connection/Schematic Wiring Diagram.

Image 9
Contents Installation LX and LT Gas-Fired Pool Table of Contents 2A-1.Special Precautions 1C. Warranty2B. Heater Assembly and Preparation LX and LT Pool Heaters2C. Heater Location 2C-1. Installation Information 2C-3. Flooring Typical Installation2C-2. Installation Clearances 2E. Outdoor Shelter Installation Canada LX and LT Pool Heaters 2D. Outdoor Installation2F-3. Air For Combustion and Ventilation 2F-2. Special Location Requirement2G. Gas Supply and Piping 2G-1. General Instructions 2F-4b.Vent Pipe Sizing InstallationHigh altitude H 2,000 to 4,500 feet 610 to 1370 m ` ` ` ` 2H. Electrical Power 2H-1.General Information 2G-2. Special Precautions for Propane Gas2H-3. Auxiliary Time Clock Wiring 2H-2. BondingRemove Jumper from Terminal Block 2H-4. Remote Operation Model LX OnlyWater Connection as Shipped 2I. Water Piping 2I-1. Reversal of Heater Water ConnectionsLX and LT Pool Heaters Typical Water Piping Piping to Heater 2I-2. Pool/Spa Piping Systems2I-4. Pressure Relief Valve 2I-3. Connections at Heater2I-5. Automatic Chlorinators Chemical Feeders 2J. Start-up and Adjustment 2J-1. Normal Operation2J-4. Adjustment of Water Pressure Switch 2J-2. Start-up2J-3. Gas Pressure Adjustment of Pressure Switch 2J-5. Water Temperature RiseWire or remove the valve handle to prevent tampering 3A. Start-Up Procedure3B-1. Information Displayed 3B. Temperature Controls3B-2. Turning the Heater On or Off 3B-4. Error StatusLX/LT Heater Service Diagnostic Guide 3C. Lighting and Shutdown 3C-1. Lighting the Heater 3C-2. Shutdown3D. Water Chemistry 3D-1. PoolsFor Your Safety Read Before Operating 3E. Spa/Hot Tub Safety Rules 3D-2d. Testing3D-2a. Spa Water Chemistry 3D-2b. Water Changing3G-2. Winterizing 3G. Seasonal Care 3G-1. Spring and Fall Operation3H. Periodic Inspection 3H-1. Owner Inspection4A. General Information 4A-1 Specifications 4A-2 Dimensions3H-2. Professional Inspection 5B. Part Numbers 5A. General Information5C. Exploded View 5C-1 Overview LX and LT Pool Heaters 5C-2 Detail View Limited Warranty